PJM Test exam 2024 with 100% correct answers
Which of the following balancing control modes is used by PJM under normal operations? - correct answer Tie-Line Bias Which of the following influences does PJM consider when performing their system load forecast? - correct answer Weather Conditions & Day of the Week All of the following are limits that must be submitted to PJM for generating units EXCEPT: 1. Eco Min 2. Eco Max 3. Emergency Max 4. Dynamic Instability - correct answer Dynamic Instability If PJM experienced an event that caused the loss of a 1,000 MW generator, which of the following would most likely provide the quickest impact to improve the undegenerating Area Control Area (ACE)? 1. Remedial Action Reserve 2. Synch Reserve 3. Non-Synch Reserve 4. Secondary Reserve - correct answer Synch Reserve Your system has experienced an event that caused the frequency to drop below 60.00 Hz, what would be the most likely event that occurred? - correct answer A generator on your system tripped offline How does the PJM dispatcher inform the Members of the PJM regulation Requirements? - correct answer All-Call In order for your generator to quality to supply regulation in the PJM Regulation market, it must be able to respond and attain its desired output within how many minutes? - correct answer 5 minutes Based on a generator capability curve, in order to maximize the MVAR output of the generator, it may be necessary to: - correct answer decrease the MW output of the unit PJM maintains a regulation quality standard which states that a generator may be certified to provide regulation only after it achieves three consecutive regulation test scores of at least - correct answer 75% Which of the following would NOT be a cause for a sudden deviation in the balancing area ACE? 1. incorrect interchange number 2. loss of a tie-line RTU 3. loss of internal load 4. loss of adjacent control area generation - correct answer loss of adjacent control area generation The primary purpose for the balancing area to have Regulation is to correct for: - correct answer small deviations in load It is necessary for Generation Owner dispatchers to notify PJM of unplanned unit outages: - correct answer as soon as practicable PJM should be made aware of any fuel shortage that a generator may experience. This information assists in analyzing the resources and reliably operating the system. A heightened awareness is expected during: - correct answer extreme hot or cold conditions Generators are required to obtain PJM approval prior to removing a generating unit from service. The only exception is for: - correct answer injury to personnel will be prevented Prior to removing a self-scheduled generator from service, the PJM member must first - correct answer give PJM the option to takeover the unit for the market When PJM experiences problems with their primary digital control signal, it sometimes becomes necessary for companies with the capability, to switch to the back-up signal. This backup signal is known as: - correct answer Analog control When PJM sends cost signals to generators, to provide direction for increasing or decreasing the facility output, this signal that is sent is known as: - correct answer Dispatch Rate Under no
Written for
- Institution
- PJM
- Course
- PJM
Document information
- Uploaded on
- January 16, 2024
- Number of pages
- 33
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
pjm test exam 2024 with 100 correct answers
Document also available in package deal