Millwright-Installation & Levelling Exam |Questions with 100% Correct Answers | Updated & Verified | 2024
Most installation procedures start at the machine foundation substructure because? a. the manual says so b. the foundation introduces misalignments in the equipment c. the foundation moves d. the foundation is inconsistant b. the foundation introduces misalignments in the equipment When installing on concrete, millwrights usally start their installation on? a. level ground b. tempered ground c. the assumption that they will have to install anchor bolts d. exsiting anchor bolts d. exsiting anchor bolts
Written for
- Institution
- Millwright
- Module
- Millwright
Document information
- Uploaded on
- January 14, 2024
- Number of pages
- 5
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
millwright installation levelling exam
Also available in package deal