100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

EPRI Quiz – Questions With Detailed Solutions

Rating
-
Sold
-
Pages
16
Grade
A+
Uploaded on
08-01-2024
Written in
2023/2024

EPRI Quiz – Questions With Detailed Solutions

Institution
Course










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Course

Document information

Uploaded on
January 8, 2024
Number of pages
16
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

EPRI Quiz – Questions With Detailed Solutions

During all crane movemenets, communication shall be maintained _____________.
✔️Ans -Continuously

If communication is disrupted at any time during crane operation, the
operator shall ___________. ✔️Ans -Stop crane movements. or unlcear
movements= do nothing.

Where are OSHA standard hand signals located? ✔️Ans -OSHA
1926.1400 Appendix A

Prior to qualifying all signal persons theyh must be tested by who?
✔️Ans -Designated Person

Where must hand signal chart be posted? ( ASME) ✔️Ans -Posted
Conspicuously

When using voice signals, who must be present for the pre lift discussion?
( ASME) ✔️Ans -Lift director, signalman, and operator

A qualified signal person must have knowledge of standard hand and voice
signals along with basic understanding of crane operations and
___________________. ✔️Ans -Limitations

Before lifting operations begin, communication systems shall be __________.
✔️Ans -Tested

Prior to commencing crane lift, the operator and signal person shall:?
✔️Ans -Identify Eachother

What is the first element of voice signals given to the operator prior to the lift?
✔️Ans -Function and Direction.

Each series of voice signals contain how many elements? ✔️Ans -3

Who has the responsibility of permitting multiple simultaneous crane
functions ( Voice)? ✔️Ans -Lift director

,Special signals cannot conflict with ? (ASME) ✔️Ans -Standard
signals

If the operator sounds 3 short audible signals while moving the crane, what do
they intent to do? ✔️Ans -Back up

If the operator sounds 1 short audible signals while moving the crane, what do
they intent to do? ✔️Ans -Stop

Any audible emergency signal must be agreed upon at each _____________.
✔️Ans -Job site location

If the operator sounds 2 short audible signals while moving the crane, what do
they intent to do? ✔️Ans -Go ahead

When signaling the tower crane, which form of communication is most
reliable? ✔️Ans -Hard wire radio

Which ASME volume is used to hand signal a tower crane? ✔️Ans -
ASME B30.3

Which ASME volume is used to hand signal a mobile crane? ✔️Ans
-ASME B30.5

Minimum clearence between any part of the crane and power lines rated at
50kv? ✔️Ans -10 FEET

Minimum clearence between any part of the crane and power lines rated at
100kv? ✔️Ans -15 FEET

Minimum clearence between a crane in transit and power lines rated at
300kv? ✔️Ans -10 FEET

A dedicated spotter must also have the qualifications of a __________.
✔️Ans -Signal Person

Authorization that the lines are de-energized must be given by whom?
✔️Ans -Utility owner/ Operator

, Which device must be attached to the crane when lifting a personnel
platform? ✔️Ans -Anti- Two block

Which hoist operation is prohibited when hoisting personnel platform?
✔️Ans -Hoist Free Fall

Inside the personnel platform except for gates, how much of the perimeter
must contain a grab rail for the occupants? ✔️Ans -100%

When signaling a personnel platform, tag lines must be used when?
✔️Ans -When necessary to control the platform.

While hoisting employees in a personnel platform, direct communication must
be maintained between the signal person and who? ✔️Ans -
Operator

What must the operator, signalman and the crew attend before they hoist a
personnel platform? ✔️Ans -Pre-lift meeting

According to OSHA, which hand signal examples must be used to signal
cranes? ✔️Ans -OSHA 1926. Subpart CC Appendix A

Prior to beginning lifting operations, the signals shall be discussed and agreed
upon by the lift director, crane operator, and whom else? ✔️Ans -
Signal person

Before lifting, the operator and signal person shall contact eachother when
using what form of communication? ✔️Ans -Voice signals

Where must the signal chart be posted? (OSHA) ✔️Ans -On the
equipment or in the area of operation

When directing a crane using voice signals the transmission must be through
a channel that is ______________. ✔️Ans -Dedicated

According to AMSE B30.23 in a suspended personnel platform without boom
motion controls, management shall designate one person to perform what
task? ✔️Ans -Communicate with the operator.
$15.49
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached


Also available in package deal

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
StudyCafe Bournemouth University (London)
Follow You need to be logged in order to follow users or courses
Sold
620
Member since
3 year
Number of followers
467
Documents
6303
Last sold
5 days ago
"Where Success Is on the Menu"

Welcome to StudyCafe, your cozy corner for academic success! Just like a favorite café where you can relax with a warm drink and a good book, StudyCafe is here to provide you with the perfect space to enhance your learning experience. Whether you're preparing for exams, reviewing notes, or looking for that extra boost in your studies, you’ll find everything you need to help you succeed. At StudyCafe, I understand that learning isn’t just about memorizing facts—it’s about understanding, growing, and feeling confident in your academic journey. That’s why I’ve carefully curated a selection of high-quality, easy-to-understand study materials, notes, and guides that cater to a variety of subjects and learning styles. Just like a great café, I want your experience here to be smooth, productive, and stress-free. Whether you're a visual learner, a note-taker, or someone who prefers concise summaries, you’ll find resources that meet your needs and make your study sessions more efficient. Thank you for choosing StudyCafe as your study companion. Together, we can create an environment that fosters success, so you can tackle your studies with confidence and achieve your academic goals. Take a seat, explore the resources, and let’s brew up some success!

Read more Read less
4.2

117 reviews

5
67
4
21
3
16
2
7
1
6

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions