Dates & Time Lengths - UST Exam (100% Accurate answers)
Under-dispenser containment was required for all UST systems by ___________. a.) December 31, 2003 b.) July 1, 1987 c.) January 1, 1984 d.) January 1, 2000 correct answers a.) December 31, 2003CCR Title 23, Sec 2636(g)(C) According to California Law, UST systems installed after July 1, 2003, require a one-time ELD test to ensure that the tank is product tight... a.) If the tank is located within one (1) mile of a public drinking water well b.) If the tank is located within 1000 feet of a public drinking water well c.) Unless the tank is equipped with secondary containment d.) In all cases correct answers For ALL tanks before use (H&SC 25290.2 (I))d.) In all casesH&SC, Sec 25290.2(i) The following is true of secondary containment testing, EXCEPT: a.) Must be tested every 24 months b.) Must be tested every 36 months c.) Results must be submitted to the local agency within 30 days of testing d.) Local agency must be notified 48 hours prior to testing correct answers a.) Must be tested every 24 months CCR Title 23, Sec 2637(a) Records of cathodic protection system maintenance must be kept on file for ______________. a.) 10 years b.) 1.5 years c.) 3 years d.) 6.5 years correct answers d.) 6.5 years CCR Title 23, Sec 2712(b) Impressed current cathodic protection systems shall be inspected no less than every ___________ to ensure that they are in proper working order: a.) 60 days b.) 90 days c.) 30 days d.) 120 days correct answers a.) 60 days CCR Title 23, Sec 2635(a)(2) Monthly monitoring data must be kept on file for _________________. a.) 3 years
Written for
- Institution
- UST
- Course
- UST
Document information
- Uploaded on
- January 7, 2024
- Number of pages
- 13
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
under dispenser containment was required for all u
Document also available in package deal