Fire inspector 2 block 1 questions and answers already passed
Fire inspector 2 block 1 questions and answers already passed NFPA develops and publishes the majority of the... Consensus standards used in U.S. and Canadian jurisdictions NFPA invites volunteers with... Expertise in field to form a committee to develop a draft ASTM Consensus based standards writing and testing organization ASTM develops testing processes that other... Testing organizations use in the development of safety products Underwriters Laboratories An independent, not-for-profit product American National Standards Institute Accredits organization, also includes an appeals process for manufacturers Model codes Only enforceable when AHJ adopts them Current fire code is used to ensure... Fire and life safety requirements are met Most are revised on a regular basis 3-5 years Local codes May be required to meet local conditions or fire dept. requirements Stakeholders Any new code or amendment should include ALL individuals and groups it affects Drafting the proposed code Written by fire and life safety code official with assistance of other fire dept. members Formal consideration Citizens are encouraged to speak in favor or in opposition to the proposal Passage In most communities a SIMPLE majority is required for passage Code modification process Modify the code Process An applicant must present a FORMAL written request to the AHJ Inspector usuallly processes the request and receives formal interpretation from who? Fire marshal Board of appeals 3 to 7 members who have experience in the field If applicant feels that the decision was reached unfair, a petition should request what? A hearing before the board of appeals may be made What is the primary goal of code enforcement? Compliance What question should the inspector know for compliance procedures? Is noncompliance with the code a violation of criminal or civil law? What is notification? A written inspection form describing the noted infractions of the fire code What are two types of permits? Operational and construction What is operational? Issued to allow a person or group to conduct an operation or business What is construction? Issues for installation or alteration of a system or equipment Three things that specify issuance of permits? Specific condition, specific location and specific period of time Who authorizes the right of entry of issuance of permits? Fire inspector authorizes right of entry at any time Once the permit is issued, the permit must be kept at? The location for which it was issued Fire watch should be maintained for at least...? 30 minutes How many feet for combustible contents? 35 feet Name the following procedures for the plans review (1) Apply (2) Submit (3) Review (4) Change (5) Accept (6) Authorize What procedure is Apply? Building owner/contractor acquires an application form What procedure is Submit? Completed form of the construction plans and documents are submitted along with appropriate fee What procedure is Review? plans and documents are reviewed by the plans examiner What procedure is Change? Owner/contractor meets with plans examiner to discuss NEEDED changes to the plan What procedure is Accept? Final set of approved plans is STAMPED AND SIGNED What procedure is Authorize? Permit to BEGIN CONSTRUCTION Building permit application should include..? Legal address of property and intended use of property What is sequence? Plans may be submitted as package and given to examiners for SIMULTANEOUS REVIEW What is fast track? Construction is begun before FINAL DETAILS What is Phases? Most often found when building or complex is designed with PLANS FOR LATER EXPANSION Building plans and construction drawings should be submitted in.. Professional and uniform manner Submittal established by? AHJ Building plans and construction drawings are most required in an acceptable ________ format? Computer aided design (CAD) Cut sheets are..? Important listing information to assure plans examiner have been tested and evaluated
Written for
- Institution
- Fire inspector 2 block 1
- Course
- Fire inspector 2 block 1
Document information
- Uploaded on
- December 19, 2023
- Number of pages
- 7
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
fire inspector 2 block 1 questions and answers alr
Also available in package deal