100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

Chapter 2 - INCOSE CSEP Test Prep Questions With 100% Correct Answers.

Rating
-
Sold
-
Pages
2
Grade
A+
Uploaded on
19-12-2023
Written in
2023/2024

Definition of Systems Engineering - Systems Engineering (SE) is an interdisciplinary approach and means to enable the realization of successful systems. It focuses on defining customer needs and required functionality early in the development cycle, documenting requirements, and then proceeding with design synthesis and system validation while considering the complete problem: operations, cost and schedule, performance, training and support, test, manufacturing, and disposal. SE considers both the business and the technical needs of all customers with the goal of providing a quality product that meets the user needs. Variance in cost overruns ________ with increasing SE effort - Lessons 2.7 with low SE effort, projects having difficulty predicting cost overruns from _____% - ______% - 0% - 200% Schedule overruns lesson with _____SE effort, minimizing at about _____% effort - increasing, 10% 2.7 with _____% SE effort cost is predictable from -20% - ____% - 12%, 41% With low SE effort, projects having difficulty predicting schedule overruns from ____% - ____% - - 35%, 300% 2.7 Schedule variance overruns _____with increasing SE effort - lessons 2.7 Primary goal of systems engineering - reduce risk associated with new systems or modifications to complex systems. 2.6The systems engineer's job is to... - Control interfaces between system elements and external systems. 2.5 Challenges in the development of a system - -system elements operate independently -System elements have different life cycles -initial reqmnts likely ambiguous -complexity is a major issue -management can over shadow engineering -fuzzy boundaries cause confusion -SOS engineering is never finished Why use SE - -reduce risk -manage complexity -manage change -projects that are 20% complete already locked in 80% of TLCC -Market penetration has reduced by a factor of 4 over the last 50 years 2.6 Cost over runs _____ with Increasing SE effort at about ___% SE effort - lessens, 10%

Show more Read less
Institution
Chapter 2 - INCOSE CSEP
Course
Chapter 2 - INCOSE CSEP








Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Chapter 2 - INCOSE CSEP
Course
Chapter 2 - INCOSE CSEP

Document information

Uploaded on
December 19, 2023
Number of pages
2
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Brainarium Delaware State University
View profile
Follow You need to be logged in order to follow users or courses
Sold
1825
Member since
2 year
Number of followers
1043
Documents
22338
Last sold
4 days ago

3.8

317 reviews

5
147
4
60
3
54
2
16
1
40

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can immediately select a different document that better matches what you need.

Pay how you prefer, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card or EFT and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions