100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

NCCCO Mobile Crane Test (New 2023/ 2024 Update) Questions and Verified Answers| Graded A| 100% Correct

Rating
-
Sold
-
Pages
26
Grade
A+
Uploaded on
19-12-2023
Written in
2023/2024

NCCCO Mobile Crane Test (New 2023/ 2024 Update) Questions and Verified Answers| Graded A| 100% Correct QUESTION Where is the tipping axis of a crawler crane located? a. It is always at the centerline of the idler or sprocket b. It depends if the idler or sprocket are in line or offset from the track rollers c. It is through the centerline of the crane cab d. It is through the boom butt section Answer: b. QUESTION What should be done with materials placed under overhead energized power lines? a. Be dragged out b. Be lifted as normal c. Not be lifted by crane d. Handled with extra care Answer: c. QUESTION What standard method hand signal is being illustrated? a. Boom up b. Boom down c. Retract boom d. Hoist Answer: c. QUESTION Where should the crane's outrigger pads or tracks be placed when working at ground floor level near a cellar wall? a. As close as possible to the wall b. At least as far back as the depth of the wall below ground c. At a distance at least half the depth of the cellar wall below ground d. Anywhere, since the wall is unaffected by the weight of the crane Answer: b. QUESTION How should the wheels of a crane be positioned when it is set up for working on outriggers? a. Just touching the ground b. As high as possible off the ground c. Just high enough off the ground to relieve the tires of crane weight d. Firmly on the ground to support the crane Answer: c. QUESTION What happens to ground bearing pressure if you move a crawler crane from soft ground to harder ground? a. It increases b. It decreases by a third c. It remains the same d. It decreases by half Answer: a. QUESTION When may a swivel be used with rotation resistant wire rope? a. Always b. Never c. If the rope manufacturer approves d. If the operator decides it's OK Answer: c. QUESTION What should you do on pick and carry operations? a. Keep the boom as short as possible b. Keep the load as high above the ground as possible c. Ensure the load is as far from the carrier/carbody as possible

Show more Read less
Institution
NCCCO/ CCO Crane
Course
NCCCO/ CCO Crane










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
NCCCO/ CCO Crane
Course
NCCCO/ CCO Crane

Document information

Uploaded on
December 19, 2023
Number of pages
26
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
ace_it Walden University
View profile
Follow You need to be logged in order to follow users or courses
Sold
3723
Member since
5 year
Number of followers
1917
Documents
4710
Last sold
11 hours ago

4.0

592 reviews

5
294
4
116
3
96
2
31
1
55

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions