Plumbing LVL 2 Final Exam Review (3) Questions and Answers
Plumbing LVL 2 Final Exam Review (3) Questions and Answers A _________ water closet is a water closet with a non-siphonic passageway at the rear of the bowl and integral flush rim and priming jets - ANSWER ️️ Blowout A ______________ urinal is a wall hung urinal with a non-siphonic passageway at the rear of the bowl an integral flush rim and jet. - ANSWER ️️ Blowout A single fixture outlet shall not exceed ____________ developed length. - ANSWER ️️ 1200 mm An offset in the wet vent shall not exceed _________ metres for pipelarger than 2 inch - ANSWER ️️ 2.5 metres ___________ shall not be used for the fixture drain or the portion of the wet vent below the floodlevel rim of manually flushing or waterless urinals. - ANSWER ️️ Copper tube When converting fixture units to litres if the number of fixture units is 260 or less the load is ____________ litres. - ANSWER ️️ 2360 litres A 4" soil or waste stack passes through 22 stories. Of the 22 stories only 13 of the 22 stories receives a discharge from fixtures. What must be done? (This is not a wet vented stack) - ANSWER ️️ A vent stack, stack vent in yoke vents need to be connected with the major vents taken to outside air
École, étude et sujet
- Établissement
- Plumbing
- Cours
- Plumbing
Infos sur le Document
- Publié le
- 17 décembre 2023
- Nombre de pages
- 2
- Écrit en
- 2023/2024
- Type
- Examen
- Contient
- Questions et réponses
Sujets
-
plumbing lvl 2 final exam review 3
Document également disponible en groupe