PJM Sample Test Review | 150 Questions with 100% Correct Answers | Verified | Latest Update 2024
Real time transmission constraints or contingencies may be alleviated with generators operating ______________ - off cost out of merit. Monitoring ___________ may give insights into system constraints. - Monitoring LMP's PJM calls for _____________ reserves to recover ace so that tie line schedules are maintained. - PJM calls on synchronized reserves If not cancelled by PJM, the minimum generation alert expires at the end of the specified ______________. - light load period When PJM declares a hot weather alert, the generation dispatcher should determine if maintenance can be deferred and notify all generating stations and key personnel. - During system restoration, the two categories of reserves are dynamic and spinning. - During system restoration, frequency should be maintained between 59.75 and 61.00 Hertz. -
Written for
- Institution
- PJM
- Course
- PJM
Document information
- Uploaded on
- December 13, 2023
- Number of pages
- 15
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
pjm sample test review 150 questions with 100 c
Also available in package deal