PJM Generation Dispatch Exam | Questions with 100% Correct Answers | Verified | Latest Update 2024 | 61 Pages
Which of the following statements is correct concerning PJM assuming frequency control of the restoration process? A) PJM assumes control once an external transmission tie has been established. B) Once an Area Control Error can be calculated, PJM will assume control. C) Whenever it becomes too much of a burden for any one Transmission Owner within the RTO D) Whenever the Transmission Owners within the RTO agree to let PJM control the process. - C) Whenever it becomes too much of a burden for any one Transmission Owner within the RTO During black start restoration, priority access to cranking power should be given to: A) Hot units that can return to service immediately. B) Combustion turbines in areas where the initial disturbance occurred C)Units with black start capability D) Hydro Units - A) Hot units that can return to service immediately. During a restoration, if you are presented with the opportunity to re-connect with the Eastern Interconnection, you should: A)Not pursue this opportunity because you may cause the Eastern Interconnection to become unstable. B) Pursue this opportunity only when you have adequate Dynamic Reserves on your system C) Pursue this opportunity as quickly as possible D) Pursue this opportunity only if you need cranking power for your generating unity - C) Pursue this opportunity as quickly as possible Complete (Total System) Blackouts are characterized by which of the following?
Written for
- Institution
- PJM Generation Dispatch
- Course
- PJM Generation Dispatch
Document information
- Uploaded on
- December 13, 2023
- Number of pages
- 61
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
pjm generation dispatch exam questions with 100
Also available in package deal