PJM Generation Operation Exam | 65 Questions with 100% Correct Answers | Verified | Latest Update 2024
Control center facilities must have a minimum of how many days of fuel for the backup generator? - 5 days If PJM ACE shows overgeneration, actual imports are: - Less than scheduled Who should a generator contact at PJM to clear an outage ticket? - Master Coordinator To correct for a slow or fast clock, system frequency schedules are offset by: - +/-.02 Hz What frequency would PJM set to correct for fast-time error? - 59.98Hz What frequency would PJM set to correct for slow-time error? - 60.02Hz What info is on an instantaneous reserve check? - synchronized (regulating and non-regulating), quick start, secondary and beyond secondary reserves Generators must provide PJM with a realistic Reactive Capability Curve. This curve must have no less than __ points, and no more than __ points. - No less than 2 and no more than 8 points A classic indicator of voltage instability is when system voltages change greatly when... - system loads change by a small amount
Written for
- Institution
- PJM Generation Operation
- Course
- PJM Generation Operation
Document information
- Uploaded on
- December 13, 2023
- Number of pages
- 7
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
pjm generation operation exam 65 questions with
Also available in package deal