100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

PE 4th Part A ABSA Test Bank Questions With Complete Solutions Graded To Pass!!

Rating
-
Sold
-
Pages
116
Grade
A+
Uploaded on
03-12-2023
Written in
2023/2024

PE 4th Part A ABSA Test Bank Questions With Complete Solutions Graded To Pass!! Introduction to Power Engineering Introduction to Power Engineering Which of the following is not a definition of a power plant? a) Any one or more boilers in which steam or other vapour is generated at more than 103 kPa (15 psi). b) Any one or more boilers containing liquid and having a working pressure exceeding 1100 kPa (160 psi). c) Any one or more boilers containing liquid and having a working temperature exceeding 121 degrees Celsius (250 degrees Fahrenheit). d) Any one or more boilers in which steam or other vapour is generated at less than 57 kPa (8 psi). e) Any engine run from one or more boilers containing liquid and having a working pressure exceeding 1100 kPa (160 psi). d) Any one or more boilers in which steam or other vapour is generated at less than 57 kPa (8 psi). Early government involvement in certification of power engineers became more important for the following reasons except: a) efficiency b) labour mobility c) safety

Show more Read less
Institution
Course











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Course

Document information

Uploaded on
December 3, 2023
Number of pages
116
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

PE 4th Part A ABSA Test Bank Questions With Complete
Solutions Graded To Pass!!
Introduction to Power Engineering
Introduction to Power Engineering
Which of the following is not a definition of a power plant?
a) Any one or more boilers in which steam or other vapour is generated at more
than 103 kPa (15 psi).
b) Any one or more boilers containing liquid and having a working pressure
exceeding 1100 kPa (160 psi).
c) Any one or more boilers containing liquid and having a working temperature
exceeding 121 degrees Celsius (250 degrees Fahrenheit).
d) Any one or more boilers in which steam or other vapour is generated at less
than 57 kPa (8 psi).
e) Any engine run from one or more boilers containing liquid and having a
working pressure exceeding 1100 kPa (160 psi).
d) Any one or more boilers in which steam or other vapour is generated at less than 57
kPa (8 psi).
Early government involvement in certification of power engineers became more
important for the following reasons except:

a) efficiency
b) labour mobility
c) safety
d) pollution
e) technological advancements
d) pollution
Which of the following is not characteristic of increased automation in power
plants?

a) computerized control stations
b) increased mechanization
c) manual flame checking
d) continuous monitoring of processes
e) continuous monitoring of costs
c) manual flame checking
"Power plant" means
a) any one or more boilers in which steam or other vapour is generated at more
than 103 kPa (15 psi).
b) any one or more boilers in which steam or other liquid is generated at more
than 103 kPa (15 psi).
c) any one or more boilers containing liquid and having a working pressure
exceeding 1,200 kPa (160 psi), and a
temperature exceeding 121 degrees C (250 degrees F).

,d) any one or more boilers containing liquid and having a working pressure
exceeding 1,200 kPa (160 psi), and a temperature not exceeding 121 degrees C
(250 degrees F).
e) any one or more boilers containing liquid and having a working pressure not
exceeding 1,100 kPa (160 psi), and a temperature exceeding 121 degrees C (250
degrees F).
a) any one or more boilers in which steam or other vapour is generated at more than
103 kPa (15 psi).
Power engineers are
a) safety code officers in a power plant automatically.
b) qualified to perform any welding jobs in a power plant.
c) skilled workers who operate and maintain the equipment in a power plant.
d) qualified to perform any electrical jobs in a power plant.
e) qualified to make design changes in a power plant.
c) skilled workers who operate and maintain the equipment in a power plant.
In the early days, owners of power plants hired __________
workers, who started out doing manual labour and through acquired experience
they were promoted to jobs with gradually increasing levels of skill.

a) qualified
b) highly educated
c) trained
d) unskilled
e) college trained
d) unskilled
In order to produce greater efficiency, higher boiler
pressures were used and this led to __________ due to
employing of unqualified operators in a power plant.

a) economic gains
b) serious accidents
c) higher efficiency
d) safer working conditions
e) less labour disputes
b) serious accidents
Which of the following is not a common work schedule for power engineers?

a) Year round employment
b) Seasonal lay-offs
c) Eight hour days
d) Twelve hour days
e) Rotating day and night shifts
b) Seasonal lay-offs
When oil mixes with water in the boiler the resultant effect is:

a) serious foaming

,b) accumulation of very hard scale resulting in tube burnout
c) accumulation of soot
d) decrease in water level
e) shifting and loosening of baffles
a) serious foaming
The holder of a Certificate of Competency, the classification of which authorizes
him or her to act as a engineer, may sketch, construct, install, operate, repair, and
give advice on all things pertaining to any __________ in which that person is
employed.

a) welding shop
b) automotive shop
c) power plant
d) fish plant
e) hydro plant
c) power plant
Power engineers can usually expect to work

a) straight 8 hour day shifts.
b) straight 12 hour day shifts.
c) straight 8 hour night shifts.
d) straight 12 hour night shifts.
e) rotating shifts.
e) rotating shifts.
In a power plant, the power engineer may function as a supervisor who directs
others in the __________ operation on a shift.

a) simple and economical
b) welding and electrical
c) administrative and cooperative
d) production and receiving
e) safe and efficient
e) safe and efficient
Committees which establish standards are composed primarily of which of the
following elements?
a) only experts from the industry and government
b) one government appointed standards board
c) experts from the industry, professional and insurance groups and all levels of
government
d) only multi-National power corporations
e) one independent safety and standardisation board
c) experts from the industry, professional and insurance groups and all levels of
government
Which of the following certificates of competency qualifies the holder to take
charge of the general care and operation of any power plant as chief steam

, engineer, and to supervise the engineers in that plant and take charge of a shift in
any power plant as shift engineer?
a) Third Class Engineer's Certificate of Competency
b) Building Operator's Certificate of Competency
c) Pressure Welder's Certificate of Competency
d) First Class Engineer's Certificate of Competency
e) Fireman's Certificate of Competency
d) First Class Engineer's Certificate of Competency
Which of the following duties is a holder of a Fourth Class Engineer's Certificate
of Competency not qualified to perform?
a) Take charge of a shift in a power plant having a capacity of more than 10,000
kW, as shift engineer.
b) Take charge of the general care and operation of a power
plant consisting of one or more coil type drumless boilers having an aggregate
capacity not over 5,000 kW, when only in use for the purpose of subterranean
thermal flooding in oil fields, as chief engineer.
c) Take charge of the general care and operation of a power plant having a
capacity of not more than 1,000 kW as chief steam engineer, and to supervise the
engineers in that plant.
d) Take charge of a shift in a power plant consisting of one or more coil type
drumless boilers having an aggregate capacity of not more than 10,000 kW, when
used only for underground thermal flooding in oil fields, as shift engineer.
e) Take charge of a shift in a power plant having a capacity of not more than 5,000
kW, as shift engineer.
a) Take charge of a shift in a power plant having a capacity of more than 10,000 kW, as
shift engineer.
Which of the following is required in order to progress to a
higher certificate?

a) Experience only
b) Education only
c) Hold the next lower level certificate only
d) Both education and the next lower level certificate
e) Education, experience, and the next lower level
certificate.
e) Education, experience, and the next lower level
The IAO is an organisation who's primary concern is:
a) lowering of maintenance costs through standardisation
b) lowering of production costs through increased automation
c) increase in safety awareness through public education
d) lowering of insurance costs through standardisation
e) increase in equipment quality through tougher government
regulation
d) lowering of insurance costs through standardisation
In the early days, the following two agencies got involved in
the certification of both power plant operators and equipment
$23.99
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached


Also available in package deal

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
ACADEMICAIDSTORE Chamberlain College Of Nursing
Follow You need to be logged in order to follow users or courses
Sold
1199
Member since
4 year
Number of followers
890
Documents
11616
Last sold
2 days ago
ACADEMICAID STORE

Welcome to ACADEMICAID store! We specialize in reliable test banks, exam questions with verified answers, practice exams, study guides, and complete exam review materials to help students pass on the first try. Our uploads support Nursing programs, professional certifications, business courses, accounting classes, and college-level exams. All documents are well-organized, accurate, exam-focused, and easy to follow, making them ideal for quizzes, midterms, finals, ATI & HESI prep, NCLEX-style practice, certification exams, and last-minute reviews. If you’re looking for trusted test banks, comprehensive exam prep, and time-saving study resources, you’re in the right place.

Read more Read less
4.1

173 reviews

5
95
4
29
3
28
2
6
1
15

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions