Millwright-Installation & Levelling Exam Questions and Answers 2023/2024 with complete solution
Millwright-Installation & Levelling Exam Questions and Answers 2023 with complete solution Most installation procedures start at the machine foundation substructure because? a. the manual says so b. the foundation introduces misalignments in the equipment c. the foundation moves d. the foundation is inconsistant - CORRECT ANSWER-b. the foundation introduces misalignments in the equipment When installing on concrete, millwrights usally start their installation on? a. level ground b. tempered ground c. the assumption that they will have to install anchor bolts d. exsiting anchor bolts - CORRECT ANSWER-d. exsiting anchor bolts
Written for
- Institution
- Millwright-Installation & Levelling
- Course
- Millwright-Installation & Levelling
Document information
- Uploaded on
- November 30, 2023
- Number of pages
- 3
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
millwright installation levelling
-
millwright installation levelling exam questions
-
most installation procedures start at the machine
Also available in package deal