DBIA: Principles of Design-Build and Post Award & Contracts, Project Delivery | 141 Questions and Answers(A+ Solution guide)
Clinger Cohen Act/Defense Procurement Reform Act 1996 - Allows all federal agencies to utilize Design-Build. Prior to that no enabling legislation existed allowing Design-Build. What Year? Standard of Care - The level of quality that any average Design Professional would be able to perform given the circumstances. Design Build - Fastest Project Delivery method, fast tracking possible overlapping design with construction utilizing incremental packages. Negotiated (Qualifications Based) - Procurement Method - Common for A/E GMP (Guaranteed Maximum Price) - Contract Format - Combines Cost-Plus & Lump-Sum, contractor reimbursed for actual cost plus a fee only up to a certain amount. Unit Price - Contract Format - cost per piece Trust, Flexibility - Successful Design Build requires _____ & _______ between participants Hammurabi - Singular responsibility for both design & construction was first made into a building code by ____ Bridging Documents - Owner provided items such as 20% design or more and provides prescriptive specs at RFP. Design Build - Single point of responsibility for both design & construction is an attribute of what delivery method?Substantiation - The process of checking milestones along the way for completeness.
Schule, Studium & Fach
- Hochschule
- DBIA: Principles of Design-Build and Post Award
- Kurs
- DBIA: Principles of Design-Build and Post Award
Dokument Information
- Hochgeladen auf
- 20. oktober 2023
- Anzahl der Seiten
- 14
- geschrieben in
- 2023/2024
- Typ
- Prüfung
- Enthält
- Fragen & Antworten
Themen
-
dbia principles of design build and post award
Ebenfalls erhältlich im paket-deal