What are the four teams that comprise the overall Project Team? Owner, Design, Installation, and Management Who would belong to the Design team? Anyone with Consultant in their title except the moving consultant Which groups make up the Management Team? Developer, Construction Manager, and Building Management Agency The End-User, Facility Manager and Building Committee comprise which team within the Project Team? Owner Which group represent the generic roles that are important to the Project process? Project Managers, Designers and Installers

Show more Read less
Institution
Course











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Course

Document information

Uploaded on
October 16, 2023
Number of pages
44
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

CTS Exam Prep Questions and Answers
100% Pass
What are the four teams that comprise the overall Project Team? ✔✔Owner, Design, Installation,

and Management




Who would belong to the Design team? ✔✔Anyone with Consultant in their title except the

moving consultant




Which groups make up the Management Team? ✔✔Developer, Construction Manager, and

Building Management Agency




The End-User, Facility Manager and Building Committee comprise which team within the

Project Team? ✔✔Owner




Which group represent the generic roles that are important to the Project process? ✔✔Project

Managers, Designers and Installers

,Which project characteristics must be considered in order to determine which method is best

suited for a particular project? ✔✔Schedule, Size, Type, Complexity, and Procurement

Requirements




What is an important aspect of funding that has a direct impact on the project process and

design/installation? ✔✔Technical Support Funding




Whether a construction project is large or small, which milestones must be achieved in a typical

schedule? ✔✔Programming, Building Design, AV Bid, and Move-In




What type of project is a typical Consultant-Led Design-Bid-Build contract structure good for?

✔✔Long term projects with extended project cycles




What is the risk in using an OFE/Integrator Installed contract structure? ✔✔System and

infrastructure design and facility functionality may suffer




What are some of the important project scope and size considerations in selecting an AV

provider? ✔✔Financial Stability, Current Workload, and Company Credentials

,What type of document typically includes Project Size Requirements, Corporate Profile, Team

Personnel, and Warranty Response Time? ✔✔RFQ




a significant difference between the Two-Envelope Bid


Method and the Qualifications- Based Selection Method? ✔✔Negotiate with the highest ranking

firm to finalize the contract




What is one of the disadvantages of contracting the AV integrator to the electrical


subcontractor? ✔✔More layers of responsibility and communication




When conducting a complete project bid process, what milestone follows the issuing of the RFP?

✔✔Pre-Bid Meeting




Under what circumstances would you likely use an A305-1986 form? ✔✔Scoring responses to

an RFQ




What is the ideal way to contract an AV integrator? ✔✔Directly to the Owner

, The process of identifying the activities that end-users need to perform, and developing the

functional descriptions of your systems is referred to as:? ✔✔Needs Analysis




What is the main task of the third Step of the Program Phase of a Project? ✔✔Conducting

program meetings




What should be included in the written Program Report? ✔✔...A conceptual and functional

system description




The more accurate means to estimate dimensions of a commercial space during a site inspection

would be to? ✔✔Count Ceiling Tiles in a drop tile instalation




A client requires a new boardroom. The sales person and engineer are sent to the premises to

measure the facility and talk to the client. At this stage they should be performing a _ ✔✔Needs

Analysis




Sightlines for audience viewing in a given presentation space can be improved by: ✔✔Providing

a sloped, or stepped, seating arrangement
$12.99
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
SonnieG

Document also available in package deal

Get to know the seller

Seller avatar
SonnieG Nyc
Follow You need to be logged in order to follow users or courses
Sold
3
Member since
2 year
Number of followers
3
Documents
246
Last sold
1 year ago

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can immediately select a different document that better matches what you need.

Pay how you prefer, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card or EFT and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions