ACI Grade 1 - Written Test Questions with Complete Solutions
ACI Grade 1 - Written Test Questions with Complete Solutions Sampling by this practice covers procedures for obtaining representative samples, on which tests are to be performed to determine ___ with quality requirements of the specifications listed under which the concrete is furnished (C172/C172M-17 = Sampling Freshly Mixed Concrete) - Correct Answer Compliance This practice covers sampling from five types of equipment which are... (C172/C172M-17 = Sampling Freshly Mixed Concrete) - Correct Answer Stationary, paving, revolving drum, continous, and open top mixers The elapsed time between obtaining the first and final portions of a composite sample shall not exceed... (C172/C172M-17 = Sampling Freshly Mixed Concrete) - Correct Answer 15 mins T or F: Portions of a composite sample shall be thoroughly remixed before beginning tests on the sample (C172/C172M-17 = Sampling Freshly Mixed Concrete) - Correct Answer True Start tests for slump, temperature, and air content within ___ after obtaining the final portion of the composite sample (C172/C172M-17 = Sampling Freshly Mixed Concrete) - Correct Answer 5 Start molding specific ends for strength tests within ___ after fabricating the composite sample (C172/C172M-17 = Sampling Freshly Mixed Concrete) - Correct Answer 15 The concrete sample must be protected from contamination and ... (C172/C172M-17 = Sampling Freshly Mixed Concrete) - Correct Answer Rapid evaporation (also sun and wind) The minimum size sample for making strength test specimens is ... (C172/C172M-17 = Sampling Freshly Mixed Concrete) - Correct Answer 28 L (aka 1 ft3) When sampling from a stationary mixer, the batch must be sampled at ___ or more regularly spaced intervals during discharge of the middle portion of the batch (C172/C172M-17 = Sampling Freshly Mixed Concrete) - Correct Answer 2 When sampling from a paving mixer, obtain samples from at least ___ different portions of the pile and combine them into one composite sample for test purposes (C172/C172M-17 = Sampling Freshly Mixed Concrete) - Correct Answer 5 When sampling from a revolving drum truck mixer, sample the concrete by collecting ___ or more portions take at regularly spaced intervals during discharge of the middle portion of the batch. (C172/C172M-17
Written for
- Institution
- ACI
- Course
- ACI
Document information
- Uploaded on
- October 12, 2023
- Number of pages
- 20
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
sampling by this practice covers procedures for ob
-
this practice covers sampling from five types of e
-
the elapsed time between obtaining the first and f
-
t or f portions of a composite sample shall be
Also available in package deal