PSM Exam Study Guide Questions with Complete Solutions 2023/2024
PSM Exam Study Guide Questions with Complete Solutions 2023/2024 Acceptable Risk - Correct Answer The average rate of loss that is considered tolerable for a given activity. Accident - Correct Answer An unplanned event or sequence of events that results in an undesirable consequence. An occurrence where property damage, material loss, detrimental environmental impact or human injury occurs. Accidental Release - Correct Answer An unanticipated emission of a regulated substance or other extremely hazardous substance into the ambient air. Action Items - Correct Answer A column in the What-If/Checklist Worksheet that serves to record any proposed risk-reduction measures that result from a PHA. Action Items include design, operating, or maintenance changes that reduce or eliminate hazards and/or consequences. Action Items identified in a hazard analysis study are preliminary in nature. Requests for additional information or study can also made as What-If/Checklist Action Items. It is common to also refer to these items as recommendations. Active Mitigation - Correct Answer Active mitigation is defined as equipment, devices, or technologies that need human, mechanical, or other energy input to function. An example is an interlock which needs an ammonia detector in order to function. Actuator - Correct Answer A mechanism that transmits movement to a component of a device such as the stem of a valve. Administrative Controls - Correct Answer Work procedures such as written safety policies, rules, supervision, schedules, and training with the goal of reducing the duration, frequency, and severity of exposure to hazardous chemicals or situations. Administrative Controls are procedural mechanisms for controlling, monitoring, or auditing human performance. An example would be written procedures designed to limit the maximum quantity of ammonia in a vessel to 80% of the vessel's total capacity. Affected Employee - Correct Answer Any employee who works within the vicinity of an ammonia refrigeration system but who is strictly prohibited from affecting the performance and safety of the system. These employees are not allowed to perform any adjustments, troubleshooting, emergency action or response, or maintenance to the ammonia refrigeration system. Affected Contractors - Correct Answer A contractor that the Process Safety team identifies as likely to be affected/impacted by the covered process but unlikely to have an effect on the covered process. Examples of such contractors are floor repairmen in a production area away from the process or truck drivers that are loading/unloading near the condenser platform, etc. Also known as Incidental Contractors
Written for
- Institution
- PSM - Professional Surveyor & Mapper
- Module
- PSM - Professional Surveyor & Mapper
Document information
- Uploaded on
- October 8, 2023
- Number of pages
- 48
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers