CSI CDT EXAM 100% CORRECTLY ANSWERED (2023/2024).
CSI CDT EXAM 100% CORRECTLY ANSWERED (2023/2024). Owner - CORRECT ANSWER-Principle stakeholder - initiates project, assumes risk, provides funding AHJ - Authorities Having Jurisdiction - CORRECT ANSWER-Protect public health, safety and welfare Design Team - CORRECT ANSWER-Address planning issues, determine design program, identify codes and regulations, produce procurement and construction documents, administer construction contract, *provide QA/QC procedures* Contractor Team - CORRECT ANSWER-Entity that constructs a facility. Uses management abilities to gather labor forces, subs, and material/product/equipment suppliers Supplier Team - CORRECT ANSWER-Furnishes the materials and products for the facility to be constructed. Fabricator, Distributor, Manufacturer, Supplier. Facility Life Cycle - CORRECT ANSWER-The life cycle of a facility, from concept through construction to use and eventual deconstruction. Project Conception Project Delivery Design Construction Documents Procurement (Bidding/Negotiating/Purchasing) Construction Facility Management Project Conception - CORRECT ANSWER-Transforms the needs of owner into clear concept on which project can be designed. Feasibility Study, Programming, Site Selection, Budgeting. Project Delivery - CORRECT ANSWER-Determine delivery method to be used. Factors - qualifications, experience, capacity, project extent, time requirements. Design - CORRECT ANSWER-Two Phases: schematic design and design development. Deliverables include graphic and written design documents and estimates of project cost. Schematic Design - CORRECT ANSWER-Overall relationships and functions. Site plan and area, general size/shape/massing of elements, elevations and exteriors established, conceptual design criteria identified. Deliverables - schematic drawings, probable cost, preliminary schedules Design Development - CORRECT ANSWER-Technical issues of constructibility and integration of systems and components. Deliverables - Tech information, outline specifications, updated schedule, updated cost estimate. Construction Documents - CORRECT ANSWER-Defined as the written and graphic documents prepared or assembled by the A/E for communicating the project design for construction and administering the construction contract. Construction documents include two major types of documents: Procurement documents and Contract documents. Procurement (Bidding/Negotiating/Purchasing) - CORRECT ANSWER-Acceptance of the contractor's bid or negotiated sum and other conditions will result in award of a contract and commencement of work. Construction - CORRECT ANSWER-Responsibilities: Contractor - perform work, project coordination, comply with project documents. A/E - construction admin, evaluation services, certify application for payment, final inspection of work. Owner - provide information, process payments, approve contract modifications, accept project upon completion. Facility Management - CORRECT ANSWER-During occupancy, owners & facility managers maintain and evaluate the performance of the project and determine suitability for continuing use. OmniClass - CORRECT ANSWER-A multi-table informational framework for organizing information used by the architectural, engineering, and construction industry. UniFormat - CORRECT ANSWER-Uniform classification system for organizing preliminary construction information into a standard order or sequence on the basis of systems or assemblies. Particularly useful in conceptual design. Element Identification. MasterFormat - CORRECT ANSWER-Arranges related construction practices, logical groupings of work results, into a series of divisions. 50 division format. Used for Specifications, data organization, and cost classification. MasterFormat Groups - CORRECT ANSWER-00 Procurement and
Written for
- Institution
- CSI CDT
- Course
- CSI CDT
Document information
- Uploaded on
- September 29, 2023
- Number of pages
- 15
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
- owner
- design team
- supplier team
- project conception
- project delivery
- schematic design
- construction documents
-
csi cdt exam 100 correctly answered
Also available in package deal