Who is responsible if the construction plans do not comply with all the applicable design codes, rules and laws? Correct Answer-Designer Which of the following types of materials has the longest lead time assuming that there is no shortage? Correct Answer-custom fabricated Which two methods occur at the same stage of the procurement process and are submitted by vendors? Correct Answer-bid and quotation T/F labor productivity measures the effect of labor only Correct Answer-false T/F units of labor productivity is in terms of output per hour Correct Answer-true T/F labor productivity can be used as a measure of performance in construction management Correct Answer-true Which of the following labor arrangement is no longer allowed ANYWHERE in the U.S.? Correct Answer-closed shop, only refer work to union workers T/F For a public project (i.e. prevailing wage job), general contractor/subcontractor needs make sure that every hour period of every worker is properly categorized for wage purposes. Correct Answer-true
Written for
- Institution
- Construction Management
- Course
- Construction Management
Document information
- Uploaded on
- September 28, 2023
- Number of pages
- 9
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
construction management exam 1 questions with corr
Also available in package deal