T Chap -01 IRPWM New (100% Errorless)
Who is responsible for the inspection, maintenance and safety of all way & works including bridges for the accuracy, quality and progress of new works and control over all expenditure in relation to budget allotment of a sub-division? correct answers Assistant Divisional Engineer What is the periodicity of submission of certificate by Assistant Divisional Engineer that all LWR/CWR under his jurisdiction is working satisfactorily? correct answers Once in a Year In which month, an Assistant Divisional Engineer submits a certificate that all LWR/CWR under his jurisdiction is working satisfactorily? correct answers February What is the percentage test check on quality and quantity by Assistant Divisional Engineer if measurement of ballast if recorded by the SSE/P.Way (In-charge)? correct answers 100% What is the percentage test check on quality and quantity by Assistant Divisional Engineer if measurement of ballast if recorded by the SSE/Works (In-charge)? correct answers 100% What is the periodicity of inspection of Office and Stores of all SSE/P.Way (In-charge) by Assistant Divisional Engineer? correct answers Once in a Year Who is responsible for monitoring the performance of "Material under trial" and the submission its report to Division office through TMS? correct answers Assistant Divisional Engineer In which paras of Indian Railways Code for the Engineering Department, Instructions on "Transfer-of-charge" of Assistant Divisional Engineer is stated? correct answers 143 to 147 How many gangs an Assistant Divisional Engineer should check during on foot inspection in his jurisdiction? correct answers Minimum one gang in each SSE/P.Way (In-charge) quarterly What is the periodicity of Foot/Trolly inspection by Assistant Divisional Engineer of routes having speed 110 Kmph and Multiple line routes? correct answers Four Months (Entire section) What is the periodicity of foot inspection by Assistant Divisional Engineer of other than routes "having speed 110 Kmph and Multiple line routes"? correct answers Quarterly (One block section per SSE/P. Way (In-charge) What is the periodicity of Trolley inspection by Assistant Divisional Engineer of routes other than "having speed 110 Kmph and Multiple line routes"? correct answers Once in 3 Months. On which routes, all form of trolley inspection should be preferably done under block protection? correct answers S110 Kmph & Multiple Line Routes What is the periodicity of Fast Train Inspection by Assistant Divisional Engineer in Engine /Rear Window which covers his entire jurisdiction? correct answers Once in a Month
Written for
- Institution
- T Chap -01 IRPWM New
- Module
- T Chap -01 IRPWM New
Document information
- Uploaded on
- September 27, 2023
- Number of pages
- 11
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
who is responsible for the inspection maintenanc