NERC Final Exam Practice Questions and Answers | Latest Updated | 100% Verified
NERC Final Exam Practice Questions and Answers | Latest Updated | 100% Verified. BAL-002 default contingency reserve restoration period (following disturbance recovery period) 90 minutes How often should BA calculate and record inadvertent interchange 60 minutes/hourly How often should BA provide MW-hour meter readings to adjacent BA's 60 minutes/hourly TLR procedure (identifying TLR level and actions to be implemented) needs updating how often 60 minutes/hourly Hourly ATC for next 48 hours calculated how often 60 minutes/hourly During EEA2/3 the energy deficient entity needs to update the RC how often until alert is terminated 60 minutes/hourly DOE-417 (disturbance reporting) should be completed by when 60 minutes BA with loss of resources must submit RFI with start time no more than how far beyond the resource loss 60 minutes Sink BA should ensure interchange modifications are submitted how soon after the modification 60 minutes If unable to calculate ACE for this long, BA must notify RC 30 minutes ACE cannot exceed BAAL for how long 30 minutes If AVR, PSS, or other voltage control device status changes from normal operation, GOP must notify TOP within how long of the change (if it does not last longer than this, no reporting necessary) 30 minutes GOP must notify TOP of change in reactive capability how quick 30 minutes TOP should return from unknown operating state how quick 30 minutes IROL Tv should be less than or equal to... (system should be returned to IROL within this time frame of exceeding) 30 minutes RC completes RT assessments of SOL/IROL violations how often 30 minutes Once BA/TOP notifies RC of emergency conditions, RC has how long to notify other BA/TOP's and neighboring RC's 30 minutes Unplanned evacuation from BES control center facility is reportable by BA/TOP/RC if it lasts longer than... 30 minutes Complete loss of communication (including backup) is reportable if it lasts longer than... 30 minutes Planned or unplanned telemetering & control equipment outages of more than how many minutes but be reported 30 minutes Default ramp rate for Western Interconnection interchange schedules 20 minutes When BA unable to calculate ACE > 30 minutes, they have how long to report to RC 15 minutes Default disturbance recovery period (time to return ACE to 0 following a disturbance, DCS) 15 minutes Congestion management requests in Eastern Interconnection from one RC to another must be implemented how quickly 15 minutes Voltage deviation of >/= 10% nominal is reportable after how long 15 minutes
Schule, Studium & Fach
- Hochschule
- NERC
- Kurs
- NERC
Dokument Information
- Hochgeladen auf
- 10. september 2023
- Anzahl der Seiten
- 15
- geschrieben in
- 2023/2024
- Typ
- Prüfung
- Enthält
- Fragen & Antworten
Themen
- nerc
- latest updated 2023 2024
- verified
-
nerc rc exam questions and answers
-
nerc final exam practice questions and answers
Ebenfalls erhältlich im paket-deal