100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

scaffolding safety test with 100% correct answers

Rating
-
Sold
-
Pages
15
Grade
A+
Uploaded on
05-09-2023
Written in
2023/2024

Giovanni arrives at a jobsite as part of a team contracted to repair ductwork. The team is given a set of scaffolding components to assemble. The scaffolding components are clearly from various manufacturers. Is it safe for Giovanni and his team to use the scaffolding? Select the correct answer and then click DONE. a.Yes, because all scaffolding components are compatible no matter whom the manufacturer is. b.Yes, if it is determined and approved by a competent person that they are compatible and the integrity of the system is maintained. c.No, because only scaffolding components from the same manufacturer may be used. d.No, because there are two different metals being used. b Jose, a house painter, performs an inspection on the wooden planks of the scaffolding. He notices that there have been several large spills of paint over them. Should he use those planks? Select the correct answer and then click DONE. a.Yes, because there are no noticeable splits. b.Yes, because the planks are not warped. c.No, because wooden planks are never scaffold grade. d.No, because the paint could cover potential defects. d Select the correct answer and then click DONE. Before erecting a scaffold, the first step is to: a.Perform a site evaluation. b.Dismantle the scaffolding. c.Inspect the scaffolding for paint. d. Repair any defective scaffolding components. a that apply to the following statement and then click DONE. You must cordon off the area prior to erecting or dismantling scaffolds above: 1.People 2.Access ways 3.Empty parking lots 4.Equipment traffic 1.2.4 Select the items below that must be considered when using scaffolding. Select all that apply and then click the DONE button. 1.Covered, underground power lines 2.Pedestrians in the area 3.Weight requirements of the scaffold 4.Types of activities to be performed on the scaffold 2.3.4 For a scaffold to be safe, it must be erected: 1.Curved 2.Straight 3.Level 4. Plumb 2.3.4 . When inspecting the surface conditions where the scaffolding will be erected, ask yourself: 1.Can the ground support the scaffolding unit? 2.Can the scaffold be erected and work be performed with a safe approach distance maintained from electrical power lines? 3.Can I use gravel to support the scaffolding? 4.Are there any unguarded openings that may affect the stability of the scaffold? 1.2.4 All wood planks used on scaffolds should be rated what grade? Select the correct answer and then click DONE. 1.Grade A 2.Grade B 3.Scaffold Plank Grade 4. Construction Grade 3 Any damaged or weakened scaffold part must be: 1.Immediately repaired if possible. 2.Immediately removed from service if damage cannot be repaired. 3.Clearly marked as unusable if damage cannot be repaired. 4.Used for backup in case another part fails, 1.2.3 Select the items that are a possible concern when inspecting wood planks. Select all that apply and then click DONE. 1.Paint 2. Splits 3.Rust 4.Rot 5.Oil 1.2.4.5 Barbara and her team erected scaffolding outside of a building earlier this week. The team has been unable to work on the project due to heavy rain over the last two days. As they return to the site to continue their work, the first step they should take is to: a. Dismantle the scaffolding. b.Use the scaffolding as is. c.Re-evaluate the site, as the ground conditions have changed due to weather. d.Add additional poles to support the scaffolding. c Ted performed a site evaluation for the purpose of erecting scaffolding. The ground where he needs to place the footing is dry but uneven in spots. What should Ted do? Select the correct answer and then click DONE. 1.Use gravel to fill in the uneven spots. 2.Use bricks to bring the scaffolding level. 3.Use mudsills to provide a firm foundation. 4.Use cinder blocks to level the uneven ground. 3 The scaffold must be capable of supporting its own weight and at least how many times the maximum intended load applied to it? Select the correct answer and then click DONE. a.Two times b.Three times c.Four times d.Five times c Which would provide a more stable foundation? Select the correct answer and then click DONE. a.One mudsill per leg b.One continuous mudsill under both legs c.One mudsill per leg extending 6 inches beyond centerline of the pole d.Two mud sills per leg b Scaffolds must be erected, dismantled, moved, or altered only under the supervision of a(n) ________. Select the correct answer and then click DONE. a.Competent person b.Incompetent person c.Anyone d.Registered engineer a

Show more Read less
Institution
OSHA CRANE SAFETY
Course
OSHA CRANE SAFETY









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
OSHA CRANE SAFETY
Course
OSHA CRANE SAFETY

Document information

Uploaded on
September 5, 2023
Number of pages
15
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

scaffolding safety test with 100% correct
answers
Giovanni arrives at a jobsite as part of a team contracted to repair ductwork. The team is given a
set of scaffolding components to assemble. The scaffolding components are clearly from various
manufacturers. Is it safe for Giovanni and his team to use the scaffolding? Select the correct answer and then click DONE. a.Yes, because all scaffolding components are compatible no matter whom the manufacturer is. b.Yes, if it is determined and approved by a competent person that they are compatible and the
integrity of the system is maintained. c.No, because only scaffolding components from the same manufacturer may be used. d.No, because there are two different metals being used. - correct answer b
Jose, a house painter, performs an inspection on the wooden planks of the scaffolding. He notices that there have been several large spills of paint over them. Should he use those planks?
Select the correct answer and then click DONE. a.Yes, because there are no noticeable splits. b.Yes, because the planks are not warped. c.No, because wooden planks are never scaffold grade. d.No, because the paint could cover potential defects. - correct answer d
Select the correct answer and then click DONE. Before erecting a scaffold, the first step is to: a.Perform a site evaluation. b.Dismantle the scaffolding. c.Inspect the scaffolding for paint.
d. Repair any defective scaffolding components. - correct answer a
that apply to the following statement and then click DONE. You must cordon off the area prior to erecting or dismantling scaffolds above: 1.People 2.Access ways 3.Empty parking lots 4.Equipment traffic - correct answer 1.2.4
Select the items below that must be considered when using scaffolding. Select all that apply and
then click the DONE button. 1.Covered, underground power lines 2.Pedestrians in the area 3.Weight requirements of the scaffold 4.Types of activities to be performed on the scaffold - correct answer 2.3.4
For a scaffold to be safe, it must be erected:

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
GUARANTEEDSUCCESS Chamberlain College Nursing
View profile
Follow You need to be logged in order to follow users or courses
Sold
651
Member since
2 year
Number of followers
314
Documents
24895
Last sold
1 day ago
Elite Exam Resources: Trusted by Top Scorers!!!!!!!!

Stop guessing. Start dominating!! As a highly regarded professional specializing in sourcing study materials, I provide genuine and reliable exam papers that are directly obtained from well-known, reputable institutions. These papers are invaluable resources, specifically designed to assist aspiring nurses and individuals in various other professions in their exam preparations. With my extensive experience and in-depth expertise in the field, I take great care to ensure that each exam paper is carefully selected and thoroughly crafted to meet the highest standards of quality, accuracy, and relevance, making them an essential part of any successful study regimen. ✅ 100% Legitimate Resources (No leaks! Ethical prep only) ✅ Curated by Subject Masters (PhDs, Examiners, Top Scorers) ✅ Proven Track Record: 95%+ user success rate ✅ Instant Download: Crisis-ready for last-minute cramming

Read more Read less
4.4

248 reviews

5
161
4
37
3
32
2
12
1
6

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions