with complete solution
Which Risk Management principle is best demonstrated by through hazard
identification and assessment in order to prevent needlessly jeopardizing
Marines and equipment?
Accept no unnecessary risk.
The statement, "You are more likely to control risks when they are identified
earlier rather than later" is associated with what Risk Management principle?
Anticipate and manage risk by planning
LCpl Jones wants to drive to his hometown for liberty in his private motor vehicle
(PMV). LCpl Jones determines that his PMV has worn tires, a winter storm is
forecasted when he plans to drive, and he has duty the night before he leaves.
Using the 5-step Risk Management Process, when should the LCpl do next to
mitigate the risk?
Assess and prioritize the hazards.
Which of the following is an example of the second step, assess hazards, in the 5-
step Risk Management Process.
Determining the greatest hazard to you relates with swimming at a new beach.
The time critical level of Risk Management applies when on-the-run decisions are
needed at the beginning of or during the execution of a task or mission.
time critical
In-depth and - levels of Risk Management are used when there is time to
document the results of the planning.
deliberate
In correct order, What Are the Steps in the ABCD Model?
Assess, balance, communicate with others, and do and debrief the event.
Choose an example of a physical control.
Wearing an approved Department of Transportation (DOT) helmet while riding a
motorcycle.
First Sergeant Jones posts a sign outside the entrance to the maintenance shop
indicating that hearing protection is required inside. This is an example of what
type of risk control?
Administrative
Which element is often present when human error exists in a mishap?
Pressure to complete the mission.
to get to a remote village, you have to cross a wooden bridge that spans a deep
chasm. concerned about the structural integrity of the bridge you halt and
request aviation support through your chain-of-command to cross the gap.
halting before crossing and requesting aviation support to cross the gap reflects
which risk management principle?
Accept no unnecessary risk.
Elevating the risk decision up the chain-of-command is part of when Risk
Management principle?
Make risk decisions at the right level.