ARM 400 Exam Questions with 100% Correct Answers (Latest 2023)
SRP stages Correct Answer -emergency stage -alternative marketing stage -contingency production stage -communication stage strategic redeployment plan Correct Answer determines how to resume operations in a way that repairs an org's reputation and ensures its recovery and survival; when BCPs fail BCP elements Correct Answer -time goal -operational goal -resources needed -details tasks and procedures -documentation risk-transfer model Correct Answer purchasing BI insurance prioritization model Correct Answer prioritizing which products to produce or which customers to serve contingency model Correct Answer developing an alternative way to maintain production traditional risk assessment Correct Answer -focus on root cause analysis -can only look backward -might not identify all root causes and the related events that contribute to a loss big data Correct Answer sets of data that are too large to be gathered and analyzed by traditional methods the big data revolution is fueled by: Correct Answer the capture, storage, and analysis of big data data capture Correct Answer enabled primarily by smart products interactions through the internet of things smart prodcuts Correct Answer an innovative item that uses sensors, wireless sensor networks, and data collection, transmission, and analysis to further enable the item to be faster, more useful, or otherwise improved
Geschreven voor
- Instelling
- ARM 400
- Vak
- ARM 400
Documentinformatie
- Geüpload op
- 1 september 2023
- Aantal pagina's
- 19
- Geschreven in
- 2023/2024
- Type
- Tentamen (uitwerkingen)
- Bevat
- Vragen en antwoorden
Onderwerpen
Ook beschikbaar in voordeelbundel