Tentamen (uitwerkingen)
Cesswi 2 Study Questions With Complete Solutions.
- Vak
- Instelling
Temporary stabilization correct answer: stone or plastic as a BMP to reduce erosion by stabilizing areas that will lay bare for an extended amount of time. EX. stockpiles, dikes, dams 5 types of plans correct answer: 1. SWPPP 2. erosion and sed. plan (ESCP) 3. drainage plan/grading plan 4. ...
[Meer zien]