100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

WGU D104 Intermediate Accounting II Units 2-3 Exam with Complete Solutions

Rating
1.0
(1)
Sold
1
Pages
15
Grade
A+
Uploaded on
16-07-2023
Written in
2022/2023

These characteristics: They are acquired for use in operations and not for resale. They are long-term in nature and usually depreciated They possess physical substance. Describe what? - ANSWER-property, plant, and equipment Only asset that is NOT depreciated - ANSWER-land PP&E - ANSWER-property, plant, and equipment historical cost - ANSWER-the cash or cash equivalent price of obtaining the asset and bringing it to the location and condition necessary for its intended use companies should NOT write up property, plant, and equipment to reflect fair value when it is above cost - ANSWER-true if the fair value of the property, plant, and equipment is less than its carrying amount, the asset may be written down - ANSWER-true Removal of old buildings—clearing, grading, and filling—is a - ANSWER-land cost includes the purchase price, freight and handling charges incurred, insurance on the equipment while in transit, cost of special foundations if required, assembling and installation costs, and costs of conducting trial runs. - ANSWER-cost of equipment full-costing approach - ANSWER-Assign a portion of all overhead to the construction process Money borrowed to pay building contractor (signed a note), $300 - ANSWER-other, non property, plant and equipment ($300) Refund of 1-month insurance premium because construction completed early - ANSWER-listed under building Wilson Co. purchased land as a factory site for $1,350,000. Wilson paid $120,000 to tear down two buildings on the land. Salvage was sold for $8,100. Legal fees of $5,220 were paid for title investigation and making the purchase. Architect's fees were $46,800. Title insurance cost $3,600, and liability insurance during construction cost $3,900. Excavation cost $15,660. The contractor was paid $4,200,000. An assessment made by the city for pavement was $9,600. - ANSWER-$1,480,320 Correct. Removal of old buildings—clearing, grading, and filling—is a land cost because this activity is necessary to get the land in condition for its intended purpose. Architect Fees, liability insurance, and excavation are included in the cost of the building. Therefore, the cost of the land is calculated as: $1,350,000 + $120,000 - $8,100 + $5,220 + $3,600 + $9,600 = $1,480,320. GAAP requires you to capitalize ___ costs incurred during construction - ANSWER-actual the amount capitalized is the lesser of actual interest cost incurred during the period or avoidable interest or The amount of interest to capitalize is limited to the lower of actual interest cost incurred during the period or avoidable interest - ANSWER-true AAE - ANSWER-Average accumulated expenditures-the total expenditures during the period, therefore the debt could have been avoided AAE can be calculated with - ANSWER-weighted or simple average capitalized interest= - ANSWER-weighted-average accumulated expenditures x% of interest companies should record property, plant, and equipment at ____ value of what they give up or at _____ value of the asset received, whichever is more clearly evident. - ANSWER-the fair value To properly reflect cost, companies account for assets purchased on long-term credit contracts at the ______ value of the consideration exchanged between the contracting parties at the date of the transaction. - ANSWER-present prudent cost concept - ANSWER-if for some reason a company ignorantly paid too much for an asset originally, it is theoretically preferable to charge a loss immediately Burchell Company purchased land and a building for a lump sum cost of $420,000. The land has a fair market value of $160,000 and the building has a fair market value of $320,000. What is the cost assigned to the land? - ANSWER-$140,000 When a purchase is made at a lump-sum price, the company allocates the cost based on the relative fair values of the assets. The land has a fair value of $160,000/($160,000 + $320,000) or 33.%. The cost allocated to the land is $420,000 x 33.% or $140,000.

Show more Read less
Institution
WGU D104
Course
WGU D104









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
WGU D104
Course
WGU D104

Document information

Uploaded on
July 16, 2023
Number of pages
15
Written in
2022/2023
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

  • wgu d104

Content preview

WGU D104 Intermediate Accounting II Units 2-3 Exam with Complete Solutions
These characteristics:
They are acquired for use in operations and not for resale.
They are long-term in nature and usually depreciated
They possess physical substance.
Describe what? - ANSWER-property, plant, and equipment
Only asset that is NOT depreciated - ANSWER-land
PP&E - ANSWER-property, plant, and equipment
historical cost - ANSWER-the cash or cash equivalent price of obtaining the asset and bringing it to the location and condition necessary for its intended use
companies should NOT write up property, plant, and equipment to reflect fair value when it is above cost - ANSWER-true
if the fair value of the property, plant, and equipment is less than its carrying amount, the asset may be written down - ANSWER-true
Removal of old buildings—clearing, grading, and filling—is a - ANSWER-land cost
includes the purchase price, freight and handling charges incurred, insurance on the equipment while in transit, cost of special foundations if required, assembling and installation costs, and costs of conducting trial runs. - ANSWER-cost of equipment
full-costing approach - ANSWER-Assign a portion of all overhead to the construction process
Money borrowed to pay building contractor (signed a note), $300 - ANSWER-other, non
property, plant and equipment ($300)
Refund of 1-month insurance premium because construction completed early - ANSWER-listed under building
Wilson Co. purchased land as a factory site for $1,350,000.
Wilson paid $120,000 to tear down two buildings on the land.
Salvage was sold for $8,100.
Legal fees of $5,220 were paid for title investigation and making the purchase.
Architect's fees were $46,800. Title insurance cost $3,600, and liability insurance during
construction cost $3,900.
Excavation cost $15,660. The contractor was paid $4,200,000.
An assessment made by the city for pavement was $9,600. - ANSWER-$1,480,320
Correct. Removal of old buildings—clearing, grading, and filling—is a land cost because
this activity is necessary to get the land in condition for its intended purpose. Architect Fees, liability insurance, and excavation are included in the cost of the building. Therefore, the cost of the land is calculated as: $1,350,000 + $120,000 - $8,100 + $5,220 + $3,600 + $9,600 = $1,480,320.
GAAP requires you to capitalize ___ costs incurred during construction - ANSWER-
actual
the amount capitalized is the lesser of actual interest cost incurred during the period or avoidable interest
or The amount of interest to capitalize is limited to the lower of actual interest cost incurred
during the period or avoidable interest - ANSWER-true
AAE - ANSWER-Average accumulated expenditures-the total expenditures during the period, therefore the debt could have been avoided
AAE can be calculated with - ANSWER-weighted or simple average
capitalized interest= - ANSWER-weighted-average accumulated expenditures x% of interest
companies should record property, plant, and equipment at ____ value of what they give up or at _____ value of the asset received, whichever is more clearly evident. - ANSWER-the fair value
To properly reflect cost, companies account for assets purchased on long-term credit contracts at the ______ value of the consideration exchanged between the contracting parties at the date of the transaction. - ANSWER-present
prudent cost concept - ANSWER-if for some reason a company ignorantly paid too much for an asset originally, it is theoretically preferable to charge a loss immediately
Burchell Company purchased land and a building for a lump sum cost of $420,000. The land has a fair market value of $160,000 and the building has a fair market value of $320,000.
What is the cost assigned to the land? - ANSWER-$140,000
When a purchase is made at a lump-sum price, the company allocates the cost based on the relative fair values of the assets. The land has a fair value of $160,000/($160,000
+ $320,000) or 33.333333%. The cost allocated to the land is $420,000 x 33.3333333%
or $140,000.

Reviews from verified buyers

Showing all reviews
2 year ago

1.0

1 reviews

5
0
4
0
3
0
2
0
1
1
Trustworthy reviews on Stuvia

All reviews are made by real Stuvia users after verified purchases.

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
CLOUND Exam
View profile
Follow You need to be logged in order to follow users or courses
Sold
603
Member since
2 year
Number of followers
389
Documents
10901
Last sold
2 days ago
PROF MM

HELLO WELCOME TO THIS PAGE WHERE YOU WILL FIND ALL EXAMS ,STUDY GUIDE ,CASE, TESTBANKS AND ANY OTHER STUDY MATERIALS,

3.9

116 reviews

5
58
4
16
3
29
2
3
1
10

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions