100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

ACQ 202 MODULE 2 EXAM questions with correct answers

Rating
-
Sold
-
Pages
5
Grade
A+
Uploaded on
30-06-2023
Written in
2022/2023

correct answers The final approval authority for system-related National Environmental Policy Act (NEPA) documentation is the: - Answer Component Acquisition Executive (CAE). Who would certify the interoperability performance of a command and control system used by both the Army and Navy? - Answer Joint Interoperability Test Command (JITC). Barriers to the successful implementation of Integrated Product and Process Development (IPPD) include the following (Select all that apply): - Answer 1. Need for significant cultural change. 2. Contractor uses IPPD / DoD does not 3. Poorly run meetings or reviews. The Navy awards a cost-plus award fee (CPAF) contract for $265 million to design and develop electronic components for a communications system within 18 months. What reports, if any, would the contractor normally need to provide to the Program Management Office regarding their cost, schedule, and technical performance? - Answer The contractor would submit a Contract Performance Report (CPR) formats 1 through 5 and an Integrated Master Schedule (IMS). Which of the following are "Best Practices" that may be appropriate for software intensive programs? (Select all that apply) - Answer Use metrics to manage and monitor risk.

Show more Read less
Institution
ACQ 202
Module
ACQ 202









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
ACQ 202
Module
ACQ 202

Document information

Uploaded on
June 30, 2023
Number of pages
5
Written in
2022/2023
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

ACQ 202 MODULE 2 EXAM questions with
correct answers
The final approval authority for system-related National Environmental Policy Act (NEPA) documentation is the: - Answer Component Acquisition Executive (CAE).
Who would certify the interoperability performance of a command and control system used by both the Army and Navy? - Answer Joint Interoperability Test Command (JITC).
Barriers to the successful implementation of Integrated Product and Process Development (IPPD) include the following (Select all that apply): - Answer 1. Need for significant cultural change.
2. Contractor uses IPPD / DoD does not
3. Poorly run meetings or reviews.
The Navy awards a cost-plus award fee (CPAF) contract for $265 million to design
and develop electronic components for a communications system within 18 months. What reports, if any, would the contractor normally need to provide to the Program Management Office regarding their cost, schedule, and technical performance? - Answer The contractor would submit a Contract Performance Report (CPR) formats 1 through 5 and an Integrated Master Schedule (IMS).
Which of the following are "Best Practices" that may be appropriate for software intensive programs? (Select all that apply) - Answer Use metrics to manage and monitor risk. Which of the following exceptions to the full funding policy would allow the Government to budget for buying three years worth of engines under one contract in order to save money? - Answer Multiyear Procurement.
Joint Interoperability Test Command (JITC) has primary responsibility for Developmental T&E functions throughout DoD. - Answer False.
Transitioning to Integrated Product and Process Development (IPPD) will involve application of certain key tenets, such as customer focus, concurrent development, and: - Answer Event-driven scheduling.
Which one of the following T&E products is required at Milestone C? - Answer Approved TEMP
If a contractor chooses to use their own quality system, they must demonstrate compliance with the established military standard through formal third party certification. . - Answer False.
A _______ is an aggregation of program elements that reflects a macro-level force mission or support mission of DOD. - Answer Major Program (MP).
Which of the following is recognized as a barrier to the successful implementation of Integrated Product and Process Development (IPPD)? - Answer Lack of commitment from top management
In fixed-price contracts: - Answer The government can terminate the contract for default if the contractor is late or his product does not meet specifications.
Which one of the following is a duty of the Director, Operational Test, and Evaluation (DOT&E)? - Answer Reviewing and analyzing the results of

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
cracker Chamberlain School Of Nursing
View profile
Follow You need to be logged in order to follow users or courses
Sold
2007
Member since
3 year
Number of followers
1342
Documents
46823
Last sold
1 day ago
✨ Cracker – Verified Study Powerhouse

Welcome to your shortcut to academic and certification success. I'm Cracker, a trusted top seller I specialize in high-quality study guides, test banks, certification prep, and real-world exam material all tailored to help you pass fast and score high.

3.8

368 reviews

5
162
4
84
3
51
2
22
1
49

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these revision notes.

Didn't get what you expected? Choose another document

No problem! You can straightaway pick a different document that better suits what you're after.

Pay as you like, start learning straight away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and smashed it. It really can be that simple.”

Alisha Student

Frequently asked questions