UST Dates and Frequency question and answers rated A+ 2023
UST Dates and Frequency question and answers rated A+ 2023Secondary containment required for all new USTs (date) - correct answer January 1, 1984 (25291; H&SC) 23 CCR closure requirements do not apply to UST closed prior to ____________________ (date) - correct answer January 1, 1984 (2670(I); CCR) New UST with pressured piping must have secondary containment after __________________(date) - correct answer July 1, 1987 (25291; H&SC) Spill Containment required for all USTs (date) - correct answer December 22, 1998 (2665; CCR) Overfill protection required for all USTs (date) - correct answer December 22, 1998 (2665; CCR) Secondary Containment required for all non-motor vehicle fuel USTs (date) - correct answer December 22, 1998 (2662 (b); CCR) Striker Plates required (date) - correct answer December 22, 1998 (2662; CCR) Single wall steel USTs required cathodic protection & lining or bladder (date) - correct answer December 22, 1998 (2662 (c); CCR) Shut down and fail safe LLDs required for single wall pressurized piping (date) - correct answer December 22, 1998 (2666 (c); CCR) Under Dispenser Containment (UDC) required for newly installed USTs (date) - correct answer January 1, 2000 (2636 (g); CCR) An individual installing UST components manufacturer's refresher training required (date) - correct answer July 1, 2001 (2715 (g)(1); CCR) Manufacturer's refresher training required for UST installers after (date) - correct answer July 1, 2001 (2715 (h); CCR)
Geschreven voor
- Instelling
- UST
- Vak
- UST
Documentinformatie
- Geüpload op
- 15 juni 2023
- Aantal pagina's
- 8
- Geschreven in
- 2022/2023
- Type
- Tentamen (uitwerkingen)
- Bevat
- Vragen en antwoorden
Onderwerpen
-
ust dates and frequency question and answers rated
-
secondary containment required for all new usts d
-
23 ccr closure requirements do not apply to ust cl
-
new ust with pressured piping must have seconda
Ook beschikbaar in voordeelbundel