MSSC Safety(2023)correctly answered to pass 2023
MSSC Safety(2023)correctly answered to pass 2023The first stage in a team development process is an awkward stage for the team members called __________. - storming - norming - performing - forming - correct answer forming Product designers should always consider the effects of tooling design and cost during __________. - Prototype development - Process capability studies - Team kickoff meetings - Maintenance of a machine - correct answer Prototype development Supervisors should set measurable objectives to __________. - eliminate the need to review employees - limit the number of employees who can receive a bonus - have good performance criteria for review of employee performance - have a way to collect data to satisfy management reports - correct answer have good performance criteria for review of employee performance Engineers working with manufacturing to become aware of tooling limitations and other problems that may increase production time and cost is an example of __________. - brainstorming - product analysis - concurrent engineering - production processing - correct answer concurrent engineering
Written for
- Institution
- MSSC
- Course
- MSSC
Document information
- Uploaded on
- May 26, 2023
- Number of pages
- 10
- Written in
- 2022/2023
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
mssc safety2023correctly answered to pass 2023
-
the first stage in a team development process is an awkward stage for the team members called storming norming performing forming f
Also available in package deal