NCIDQ IDFX rated A+ already passed 2023
NCIDQ IDFX rated A+ already passed 2023 Evaluate the materials with two light sources of different spectral character - correct answer What method would the designer use to evaluate materials and finishes for a project without knowledge of the building standard lighting temperature? Envelope - correct answer Which term refers to the entire enclosed area of a building? Wall thickness - correct answer What is poshe used to represent on a floorplan? Fully adjustable chair, adjustable height desk, telescoping keyboard tray and adjustable monitor arm - correct answer Which group of products BEST addresses ergonomic and universal design principals when designing an individual workstation? obtain the original drawings, field verify and document existing conditions - correct answer What should be done before starting schematic design work on an office renovation with no existing electronic plans? Nylon - correct answer 90% of carpet sold today is comprised of which fiber? Occupancy sensor - correct answer Which of the following lighting controls automatically turns on lights on or off depending on the movement in a room? Perspective drawings - correct answer For a kitchen remodel client presentation, which of the following drawing types will be the MOST effective? The monitor depth will not project more that 4" [102mm] into the corridor - correct answer A digital signage monitor is going to be installed in an elevator lobby, with the bottom edge at 36" [914mm] AFF. What does the designer need to confirm with the signage vendor? Design Development - correct answer During which design phase would an interior designer start an outline specification? Concert hall - correct answer Which of the project types below would MOST require an acoustical designer? To illustrate finishes and millwork design - correct answer Why is it important to include interior elevations as part of the construction documents? Reflected ceiling plan - correct answer A designer specified three (3) pendant light fixtures over a dining table. Where are installation locations and distances between fixtures indicated? Handrail height - correct answer When dimensioning a stair section that must be called out to make sure the stair is build to code? Floor plan - correct answer When a construction project is completed in phases, where does an interior designer identify the limits of the project scope for each phase? Solid core wood door - correct answer Which door type could be considered a rated door? Redline - correct answer What is the process called when drawings are marked up, before or during construction, to show where problems exist? Field-measure all spaces and create as-built (record) drawings - correct answer An interior Designer is beginning a project in a building without current drawings. What are the NEXT steps? In the submittal requirements of the specifications. - correct answer The client has requested to see a mock-up of the wood paneling for the boardroom. Where should the designer indicate the requirement? incandescent lamp - correct answer In terms of occupant health, which of the following lamp types is BEST for use in the bedroom?
Written for
- Institution
- NCIDQ
- Course
- NCIDQ
Document information
- Uploaded on
- May 13, 2023
- Number of pages
- 5
- Written in
- 2022/2023
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
ncidq idfx rated a already passed 2023
-
evaluate the materials with two light sources of different spectral character what method would the designer use to evaluate materials and finishes for a projec
Also available in package deal