100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

NERC text questions and answers 2022/2023 with complete solution

Rating
-
Sold
-
Pages
22
Grade
A+
Uploaded on
10-05-2023
Written in
2022/2023

NERC text questions and answers 2022/2023 with complete solution Operating reserve may be provided by which of the following? A. LTCs B. Capacitor banks C. Voltage regulators D. Interruptible loads D. Interruptible loads Which of the following is the responsibility of a reserve sharing group (RSG)? A. Complying with DCS as if it was a single control area B. Proving regulation service for neighboring RSGs C. Ensuring each control area in the group maintains 50% blackstart capability D. Complying with the control performance standards as if it was a single control area A. Complying with DCS as if it was a single control area Generation is not sufficient to meet load, the control area is importing heavily, and voltage is decaying, which of the following actions should be taken by the operator? A. Shed load B. Correct schedule deviation C. Use the Interconnection Hotline D. Schedule interchange transaction A. Shed load What measures power flow data between control areas? A. OASIS B. Interchange C. Transactions D. Tie-Line metering D. Tie-Line metering Transmission line removal as a voltage control can be used if: A. Loop flow remains high B. Reactive equipment is available C. Reliability stays at acceptable levels D. Synchronous condensers are off the line C. Reliability stays at acceptable levels Control Area A is generating and sending Control Area B a schedule. Both control areas should verify all of the following EXCEPT: A. Magnitude (MW) B. Ramp rate C. Price D. Start/stop times C. Price The AGC control mode that is normally used for system operation is: A. Flat Tie Mode

Show more Read less
Institution
Course










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Course

Document information

Uploaded on
May 10, 2023
Number of pages
22
Written in
2022/2023
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

NERC text questions and answers 2022/2023 with complete
solution
Operating reserve may be provided by which of the following?
A. LTCs
B. Capacitor banks
C. Voltage regulators
D. Interruptible loads
D. Interruptible loads
Which of the following is the responsibility of a reserve sharing group (RSG)?
A. Complying with DCS as if it was a single control area
B. Proving regulation service for neighboring RSGs
C. Ensuring each control area in the group maintains 50% blackstart capability
D. Complying with the control performance standards as if it was a single control
area
A. Complying with DCS as if it was a single control area
Generation is not sufficient to meet load, the control area is importing heavily,
and voltage is decaying, which of the following actions should be taken by the
operator?
A. Shed load
B. Correct schedule deviation
C. Use the Interconnection Hotline
D. Schedule interchange transaction
A. Shed load
What measures power flow data between control areas?
A. OASIS
B. Interchange
C. Transactions
D. Tie-Line metering
D. Tie-Line metering
Transmission line removal as a voltage control can be used if:
A. Loop flow remains high
B. Reactive equipment is available
C. Reliability stays at acceptable levels
D. Synchronous condensers are off the line
C. Reliability stays at acceptable levels
Control Area A is generating and sending Control Area B a schedule. Both
control areas should verify all of the following EXCEPT:
A. Magnitude (MW)
B. Ramp rate
C. Price
D. Start/stop times
C. Price
The AGC control mode that is normally used for system operation is:
A. Flat Tie Mode

,B. Flat Frequency Mode
C. Frequency Bias Mode
D. Tie Line Bias Mode
D. Tie Line Bias Mode
There has been a wide-area disturbance. The transfers through the system have
increased and there is a possibility that loss of one major tie line would cause
corresponding loading and voltage deviations. Having system resources
available, the security coordinator should:
A. Increase generation to reduce flows across the ties
B. Implement schedule changes across the hour
C. Implement a voltage reduction plan
D. Advise the supervisor
A. Increase generation to reduce flows across the ties
When referring to transmission lines of an interconnected network, neighboring
systems should use:
A. Own line identifiers and ratings
B. NERC line identifiers and ratings
C. Region line identifiers and ratings
D. Uniform (common) line identifiers and ratings
D. Uniform (common) line identifiers and ratings
To what level should a control area maintain its own reactive reserves?
A. 105% voltage level
B. 95% voltage level
C. First contingency conditions
D. Second contingency conditions
C. First contingency conditions
Which load shedding step should be implemented first (per Policy 6B)?
A. Manual
B. Underfrequency
C. Rate of voltage decay
D. Rate of frequency decay
A. Manual
Between sending, receiving, and intermediary control areas, what is the minimum
information pertaining to an interchange schedule that must be confirmed?
1. The scheduling path & magnitude of the transaction
2. The Start/stop times, ramp times, and duration
3. Price of energy
4. Loss accounting including MVAR at points of receipt and delivery
A. 1 and 2
B. 1 and 4
C. 2 and 3
D. 3 and 4
A. 1 and 2
Control areas shall NOT operate to cause any other system to violate established
operating reliability criteria from changes made to:
A. Interchange schedules

, B. Capacitor banks
C. Reactors
D. LTCs
A. Interchange schedules
Per Policy 4, 4A, In order to predict the system's near term load pattern, a system
operator must have information including weather forecasts and:
A. Sufficient metering
B. Past load patterns
C. Projected load patterns
D. Generator overhaul schedules
B. Past load patterns
All of the following electric system security data are to be updated at least every
10 minutes EXCEPT:
A. Operating reserve
B. Control area demand
C. Area control area frequency
D. Forecast changes on equipment status
D. Forecast changes on equipment status
Security Coordinator A requests Reliability Coordinator B to curtail a transaction
from B to C. The Reliability Coordinator B should do which of the following:
A. Ask A to redispatch
B. Honor the request
C. Implement voltage reduction
D. Coordinate with regional office
B. Honor the request
The NERC certification examination program should comply with the standards
established by which of the following?
A. National Commission for Certifying Agencies
B. American National Standards Institute
C. American Society of Testing Materials
D. National Bureau of Standards
A. National Commission for Certifying Agencies
System operator training program criteria should be based upon all of the
following EXCEPT:
A. FERC criteria
B. Regional council policies
C. NERC operating policies
D. Regulatory requirements
A. FERC criteria
Which of the following actions is used to prevent a voltage collapse when
reactive resources are insufficient?
A. Lower transmission voltage regulator settings
B. Implement load reduction
C. Offset scheduled frequency
D. Reduce generator output
B. Implement load reduction
$12.49
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached


Document also available in package deal

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
LECTMAGGY Chamberlain College Of Nursing
Follow You need to be logged in order to follow users or courses
Sold
145
Member since
3 year
Number of followers
121
Documents
6310
Last sold
2 months ago
LECTMAGGY

Here, you will find everything you need in NURSING EXAMS AND TESTBANKS.Contact us, to fetch it for you in minutes if we do not have it in this shop.BUY WITHOUT DOUBT!!!!Always leave a review after purchasing any document so as to make sure our customers are 100% satisfied.

3.2

27 reviews

5
7
4
3
3
11
2
0
1
6

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can immediately select a different document that better matches what you need.

Pay how you prefer, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card or EFT and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions