ACQ 101 module 6 Work Breakdown Structure WBS Questions and Answers Rated A+
ACQ 101 module 6 Work Breakdown Structure WBS Questions and Answers Rated A+ DoD components and contractors use WBSs as a foundation to establish schedules and formulating budgets. True The DoD provides guidance for the development of a standardized WBS. The principal document that describes these structures is derived from which of the following? MIL-STD-881C The principal document that the DoD employs in developing and standardizing WBS is the "DoD standard practice work breakdown structures for defense materiel items." In the document, how many types of systems are covered? 11 eleven What are the common elements of WBSs? integration, assembly, test and checkout; systems engineering; program management; training; data; system test and evaluation; peculiar support equipment; common support equipment; operation and site activation; industrial facilities; initial spares and repair parts. Which of the following is referred to as the "product part" of a WBS? system elements The common elements of a WBS are elements common to all acquisition programs developed by the DoD. Common elements can be found at all levels of a WBS. They are the actual configuration items of the system, and enable the realization of the system. false; common elements can be found at all levels of a WBS. They are the enabler for the system realization. They are applicable to all major systems and subsystems as needed. They are NOT the actual configuration items of the system, but elements that enable the realization of the system. Program WBS is controlled and maintained by? program management office PMO Contract WBS is controlled and maintained by? the contractor WBS Level 3 elements are subordinate elements of each Level 2 major element. Which of the following are identified as level 3 elements? fire control type of service; technical publication The Program WBS has 3 levels; what are they and what do they cover? Level 1 is the entire aircraft system; Level 2 covers the prime mission products including the aircraft system hardware and software and includes the aggregations of system-level services such as program management, system engineering, and test and evaluation. Level 3 consists of the subordinate elements of each of the major elements of level 2. Contract WBS defines that part of the program that is being produced by a given contractor and is the basis for collecting cost and schedule data for the contract. True Which of the following are the levels included in the Program WBS? Level 1; Level 3 (Level 1 is the overall project; level 2 is the major elements; and level 3 refers to the subordinate elements of Level 2.) What are the two types of WBS? Program & Contract What is the Control Account Manager CAM responsible for? The CAM is responsible for allocating resources and planning schedules to accomplish the tasks within a control account (associated with an element of the WBS); work/planning packages the CAM develops within their control account become part of the Integrated Master Schedule (IMS) and the Performance Measurement Baseline (PMB). WBS plays a significant role in which of the following? The WBS plays a significant role in planning and assigning management and technical responsibilities; monitoring and controlling the progress and status of engineering efforts, resource allocations, cost estimates, expenditures, and cost and technical performance. The WBS provides a consistent and visible framework for materiel items and contracts within a program throughout its life cycle. True The Program WBS covers the acquisition of a specific defense materiel item. True The Contract WBS begins at what level? Level 4 What is a tool used to identify issues and concerns and to reduce risk? Work Breakdown Structure WBS This person or organization develops and controls the program levels 1-3 of the WBS. The Program Management Office PMO A Project Manager PM uses this to help with cost, schedule, performance and risk management? WBS Missile and Space Systems are covered in this document? MIL-STD_881C The MIL-STD_881C serves this purpose? It describes the DoD's standardized WBS structure. Its goal is to define the relationship among all program elements? The WBS in relation to the Acquisition Life Cycle Level 4 marks the beginning of this level? Contract Level This is used to organize the breakdown of work into small areas and parts? WBS This is prepared and maintained by the contractor? Contract WBS What type of WBS is prepared and maintained by the government? Program A work breakdown structure WBS can be used to help the manager: Stay within budget by identifying and analyzing tradeoffs
Written for
- Institution
- ACQ 101
- Course
- ACQ 101
Document information
- Uploaded on
- March 23, 2023
- Number of pages
- 5
- Written in
- 2022/2023
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
acq 101 module 6 work breakdown structure wbs questions and answers rated a
-
dod components and contractors use wbss as a foundation to establish schedules and formulating budgets true
Also available in package deal