IAHCSMM CER Progress Test (Mix of all 4) QUESTIONS WITH COMPLETE SOLUTIONS
Specific tasks to be done, time horizons for these tasks, and resource allocation are all part of an effective: A. Preventive maintenance program B. Leak testing policy C. Action Plan D. All the above D Quality management measures for endoscopes include repair cost per procedure for each endoscope. A. True B. False A When receiving a loaned endoscope that is made by a different manufacturer than what the facility uses, competencies do not need to be done, as long as the endoscope is the same type as the one the facility sent out for repair. A. True B. False B Surveyors may ask staff in the endoscope reprocessing area to demonstrate departmental protocols for damaged endoscopes. A. True B. False B It is important for all staff who process endoscopes to understand the point of use preparation and handling of endoscopes. A. True B. False A Operative (therapeutic) flexible endosc
Written for
- Institution
-
Liberty University
- Course
-
IAHCSMM
Document information
- Uploaded on
- February 19, 2023
- Number of pages
- 8
- Written in
- 2022/2023
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
iahcsmm cer progress test mix of all 4 questions with complete solutions
Document also available in package deal