NERC flashcard set Reliability coordinator (RC) 220 questions| with complete solutions
What entity balances generation and monitors/employs contingency reserves? correct answer: Balancing Authority (BA) What entity has the widest system view and is the "supervisor"? correct answer: Reliability coordinator (RC) What entity monitors transmission lines and operates tap-changers, breakers, capacitors, etc? correct answer: Transmission Operators (TOP) What is a group of BAs that have agreements to help cover each other's reserve and regulation requirements? correct answer: Reserve Sharing Group (RSG) What entity schedules energy transitions and buys and sells energy? correct answer: Purchasing and Selling Entity (PSE) What's an LSE? correct answer: Load serving entity. (what it sounds like What's the difference between a GOP and a GO? correct answer: Generator Operator (entity that operates the generation). Generator Owner (owns generation, in charge of certain requirements needed to operate a generator in the NERC world) What does SCADA stand for? What's it do? correct answer: Supervisory control and data acquisition. It's the program/screen you use to see your equipment and operate it. (you'd see all your busses, breakers, switches, generators, capacitors, etc) What is inertia? correct answer: The kinetic energy "stored" in the power system's large, synchronous generators. Upon a loss of generation, inertia opposes the slowing of frequency. What is a "peaking" generator? correct answer: A generator that only comes on during the load peak in the day. Typically gas turbines. Name two types of generators that don't provide inertia. correct answer: Wind and Solar What can fuel restrictions lead to? correct answer: Capacity concerns (wet coal, natural gas distribution issues) What is p.u. correct answer: Per unit". 347kv of a line rated to 345kv will be slightly over 1.0 p.u. What are the units of Power? What are the units of Energy? correct answer: MW. MWH (MW-hrs).
Written for
- Institution
-
Liberty University
- Course
-
NERC
Document information
- Uploaded on
- December 9, 2022
- Number of pages
- 16
- Written in
- 2022/2023
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
nerc flashcard set reliability coordinator rc 220 questions| with complete solutions
Also available in package deal