contains 18 Questions
1) Match the type of T&E to its appropriate description. [22.101.1.1 Recognize
characteristics of DoD Test & Evaluation (T&E).]
a) DT&E
b) OT&E
c) LFT&E
An engineering tool, in a laboratory environment, used to reduce risk
a
throughout the acquisition lifecycle.
The actual or simulated employment, by typical users, of a system under
b
realistic operational conditions.
c Takes place on a test range and software safety is critical.
2) DoD policy for T&E is SET by what DoD mandate? [22.101.1.2 Identify laws,
policies and regulations that govern DoD Test & Evaluation (T&E).]
DoDD 5000.01 – The Defense Acquisition System
CJCSI 3170 Joint Capability Integration and Development System (JCIDS)
ISO/IEC/IEEE 29119-3:2013
Title 10 U.S. Code
3) What is considered a risk management tool that supports and enables DoD Program
Managers and Engineers to make timely, accurate decisions in building systems that work?
[22.101.1.3 Define the purpose of DoD Test & Evaluation (T&E).]
Software testing
Integrated systems testing
This study source was downloaded by 100000832361371 from CourseHero.com on 04-12-2022 13:41:02 GMT -05:00
https://www.coursehero.com/file/30223630/ISA-101-Mod-15-Software-Developmentdocx/
, Hardware testing
Interconnectivity testing
4) What is the intent of software testing? [22.101.1.4 Recognize characteristics of
Software Testing.]
to find software defects
to restore systems operations once software defects are removed
to fix software issues
to implement software change requests
5) What must be chosen, collected and analyzed to clearly quantify software performance
and its impact on system performance? [22.101.1.5 Recognize the Software Test &
Evaluation (T&E) mission.]
scientific-based measures
high quantity of quality metrics
creatively formulated measurement techniques
information metrics
6) What is the PM's primary T&E planning and management authority? [22.101.1.6
Identify the Test & Evaluation (T&E) responsibilities of the IT Program Manager
(PM).]
the approved Test and Evaluation Master Plan (TEMP)
the approved Software Test Plan (STP)
a positive past performance evaluation
a successful Milestone A review
7) Which of the following are characteristics of DoD Software Test Planning and Testing?
[22.101.1.7 Recognize characteristics of DoD Software Test Planning.] [Remediation
Accessed :N]