100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Class notes

Lecture notes Electrical Engineering (ESC)

Rating
-
Sold
-
Pages
5
Uploaded on
07-10-2021
Written in
2021/2022

Electrical Engineering Class Notes Q&A

Institution
Course









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Course

Document information

Uploaded on
October 7, 2021
Number of pages
5
Written in
2021/2022
Type
Class notes
Professor(s)
Russ
Contains
All classes

Subjects

Content preview

Electrical Engineering
Study Pack Q&A


When you visit the site to make a note of the physical
surroundings where construction is to take place there
is FOUR important notes to make. Name them.
Are there any three branches that could touch the power lines
once they are erected.
The soil types. If the ground is clay or sand, deeper pilings will
have to be used in erection of pylons, and the holes for poles
will have to be deeper than if the ground was more solid.
Are there people living near or on the site. It could happen that
between planning and construction people have moved onto
the land. If this is the case, an interdict and eviction notice
against them may have to be obtained.
Are there any newly erected buildings or structures?

Erection of overhead lines.
There are a number of factors to be taken into account
when planning the erection of a transmission line.
Name the FIVE most important ones.
The voltage which is going to be used
The route to be taken and the terrain to be crossed
The size of the load, taking future expansion into account
The type of supports, insulators and conductors to be used
The relative cost and merits of each factor must be taken into
consideration

, What is the purpose of (a) a strut (b) a stay wire?
Strut and stay wires are used at the beginning or end of a line
or where a change of direction takes place in order to keep the
pole upright.


Name TWO important rules that must be adhere to when
a hole has been dug for pylons and transformer
foundations.
If the ground is clay or sand, pilings have to be driven down to
bedrock
Proper earthing has to be supplied


What is the purpose of a safety belt?
Safety belts must be worn when working on high and
dangerous places such as on poles and over moving
machinery to prevent serious injuries by falling.


Name FIVE different types of towers.
Single foundation lattice tower
Broad base lattice tower
Double-circuit tower
Portal tower
Single-circuit tower


For what reason are we using insulated cross arms?
It would reduce tower height by the length of one insulator
string.
$3.07
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
tracy-leevassen

Also available in package deal

Get to know the seller

Seller avatar
tracy-leevassen Iqhayiya
Follow You need to be logged in order to follow users or courses
Sold
0
Member since
4 year
Number of followers
1
Documents
10
Last sold
-

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions