Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 10 pages
Exam (elaborations)

1A DAU ACQ1010 Review Notes comprehensive Questions and Answers with 100% Correct Answers | Latest Version

Document preview thumbnail
Preview 2 out of 10 pages

1A DAU ACQ1010 Review Notes comprehensive Questions and Answers with 100% Correct Answers | Latest Version

Content preview

1A DAU ACQ1010 Review Notes comprehensive Questions
and Answers with 100% Correct Answers | Latest Version

Question 1.
Defense Acquisition Objective
Correct Answer: Provide measurable improvements in mission capabilities for
warfighter/system users

Question 2.
Defense Acquisition System
Correct Answer: management process by which the DoD provides effective,
affordable, and timely system to the users.

Question 3.
Defense Acquisition Executive (DAE)
Correct Answer: Is the USD (AT&L) who has responsibility for supervising the
Defense Acquisition System. The DAE takes precedence on all acquisition matters
after the secretary and the deputy secretary.

Question 4.
Milestone Decision Authority (MDA)
Correct Answer: designated individual with overall responsibility for a program. The
MDA shall have the authority to approve entry of an acquisition program into the next
phase of the acquisition process and shall be accountable for cost, schedule, and
performance reporting to higher authority, including Congressional reporting.

Question 5.
Program Manager (PM)
Correct Answer: designated individual with responsibility for and authority to
accomplish program objectives for development, production, and sustainment to
meet the users operational needs. PM is accountable for credible cost, schedule, and
performance reporting to MDA.

Question 6.
DoD Directive 5000.01
Correct Answer: Mandatory Policies and procedures for managing all acquisition
programs.

, Question 7.
DoD directive 5000.02
Correct Answer: Detailed procedures necessary to implement policies in 5000.01

Question 8.
DoDD 5000.01 Important Policy Statements
Correct Answer: • The primary objective of Defense acquisition is to acquire quality
products that satisfy user needs with measurable improvements to mission capability
and operational support, in a timely manner, and at a fair and reasonable price. • Long
range planning will be based on best estimates of future fiscal resources • Mission
needs shall be initially expressed in broad operational capability terms • Acquisition
process shall be structured in discrete phases separated by major decision points • A
full range of alternatives must be considered before starting a new acquisition
program • Advanced technology shall be integrated into producible systems and
deployed in the shortest time practicable. • Evolutionary acquisition strategies are the
preferred approach to satisfying operational needs. • Risk and risk management shall
be addressed at each milestone decision point • Contract type must permit equitable
and sensible allocation of risk between government and industry • Broad cost,
schedule and performance parameters will be established at the new start decision,
then refined and expanded for subsequent program baselines • Competition will be
used to the maximum extent practicable • MDAs and PMs shall tailor program
strategies and oversight, including documentation of program information,
acquisition phases, the timing and scope of decision reviews, and decision levels, to
fit the particular conditions of that program, consistent with applicable laws and
regulations and the time-sensitivity of the capability need. • Milestone decisions will
be delegated to the lowest levels deemed appropriate

Question 9.
Move major defense acquisition programs (MDAPs) forward with:
Correct Answer: 1) Defined and stable requirements 2) Clearly Mature technologies 3)
Solid design and manufacturing processes 4) Realistic program cost and schedule
estimates

Question 10.
Initials Capabilities Document (ICD)
Correct Answer: describes broad, time-phased, operational goals, and describing
requisite capabilities

Question 11.
Capabilities Development Document (CDD)
Correct Answer: builds on the ICD and provides the detailed operational performance
parameters and specific program requirements necessary to design the proposed
system

Document information

Uploaded on
August 18, 2026
Number of pages
10
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$15.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Favorgrades
3.8
(193)
Sold
824
Followers
376
Items
49014
Last sold
2 weeks ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions