Content preview

VA DEQ ESC Inspector Exam (New 2026/
2027 Update) Questions & Answers {Grade
A} 100% Correct (Verified Solutions)

Variances - Correct answer VESCP authority may waive or modify any of the


requirements that are deemed inappropriate or too restrictive for site conditions, by


granting a variance




requests must be considered judiciously, and the VESCP authority should take a


conservative and responsible approach, keeping in mind the need to protect


downstream properties and the environment from damage due to soil erosion,


sediment deposition, and nonagricultural runoff




should only be approved when they are reasonable and supported by site-specific


rationale




may be granted under these conditions:

,1. at time of plan submission, applicant can request a variance to become a part of the


approved ESC plan




- applicant explains reasoning to VESCP authority in writing


- VESCP authority approves or disapproves the variance and documents the variance


on plans




2. during construction, person responsible for implementing the approved plan can


request a variance (when field conditions/situation changes)




- request is made in writing to VESCP authority


- VESCP authority approves or disapproves the request


- If no response from VESCP authority within 10 days, the request is disapproved

-applicant may resubmit a variance request with additional documentation




*cannot be granted for economic reasons

,VESCP authority shall consider variance requests judiciously, keeping in mind both the


need of the applicant to maximize cost effectiveness and the need to protect off-site


properties and resources from damage (9VAC25-840-50)




9VAC25-840-80 - Correct answer Criteria for determining status of land-disturbing


activity




A. program administrator shall determine the validity of a claim of exempt status by a


property owner who disturbs 10,000 sf or more or 2,500 sf or more in all areas of


jurisdictions designated as subject to the Chesapeake Bay Preservation Area


Designation and Management Regulations (9VAC25-830); as soon as nonexempt status


is determined, the requirements of the Act shall be immediately enforced.




B. should a land-disturbing activity not begin during the 180-day period following plan


approval or cease for more than 180 days, the VESCP authority may evaluate the


existing approved erosion and sediment control plan to determine whether the plan


still satisfies local and state erosion and sediment control criteria and to verify that all

design factors are still valid; if VESCP authority find the previously filed plan to be

, inadequate, a modified plan shall be submitted and approved prior to the resumption of


land-disturbing activity (no grand-fathering in erosion)




Virginia Erosion and Sediment Control Program - Correct answer put in by the General


Assembly to operate at the local level; for programs to prevent the unreasonable


degradation of properties, stream channels, waters, and other natural resources




ESC Program Goal - Correct answer "effective control of soil erosion, sediment


deposition, and nonagricultural runoff...to prevent the unreasonable degradation of


property, stream channels, waters, and other natural resources." (due to non-


agricultural activities)




protect downstream properties from

- sediment deposition


- damage due to increases in volume, velocity and peak flow rates or runoff




Virginia Erosion and Sediment Control Law (ESCL) - Correct answer requires that

State Water Control Board "shall develop a program and promulgate regulations for

Document information

Uploaded on
August 12, 2026
Number of pages
55
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$14.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
examvaulthub
2.0
(2)
Sold
14
Followers
0
Items
1268
Last sold
1 month ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions