1. The primary purpose of surveying is to:
A. Design buildings
B. Measure and determine positions of points on Earth's surface
C. Manufacture instruments
D. Analyze soil composition
Answer: B
Rationale: Surveying involves measuring distances, angles, and positions to establish
locations on the Earth's surface.
2. A surveyor uses a benchmark to establish:
A. Horizontal distance
B. Reference elevation
C. Property ownership
D. Soil type
Answer: B
Rationale: A benchmark is a fixed reference point with a known elevation.
3. The basic unit of length in the U.S. customary surveying system is:
, A. Meter
B. Foot
C. Kilometer
D. Centimeter
Answer: B
Rationale: Surveying in the United States commonly uses feet for linear measurements.
4. Precision refers to:
A. Closeness to the true value
B. Degree of repeatability of measurements
C. Size of an instrument
D. Speed of measurement
Answer: B
Rationale: Precision describes how closely repeated measurements agree with each
other.
5. Accuracy refers to:
A. Agreement with the true value
B. Number of measurements taken
C. Instrument weight
D. Measurement speed
Answer: A
Rationale: Accuracy indicates how close a measurement is to the actual value.
6. A total station measures:
A. Angles and distances electronically
B. Soil density only
, C. Only vertical angles
D. Magnetic direction
Answer: A
Rationale: A total station measures angles and distances electronically.
7. A closed traverse:
A. Ends at its starting point
B. Has no measurements
C. Uses only vertical angles
D. Cannot be adjusted
Answer: A
Rationale: A closed traverse returns to the starting point and allows error checks.
8. A field notebook is used to:
A. Record survey observations
B. Store equipment
C. Calculate taxes
D. Draw architectural plans only
Answer: A
Rationale: Field notes document measurements, observations, and procedures.
9. A survey stake is used to:
A. Mark a location on the ground
B. Measure temperature
C. Determine ownership automatically
D. Calculate angles
, Answer: A
Rationale: Stakes provide physical markers for surveyed points.
10. The main purpose of leveling is to determine:
A. Elevation differences
B. Horizontal angles
C. Magnetic direction
D. Property value
Answer: A
Rationale: Leveling determines elevation differences between points.
11. Which of the following best describes the purpose of the Surveyor-in-Training
(SIT) designation within the licensure pathway?
A. It serves as a final professional license allowing independent practice
B. It certifies completion of the Principles and Practice of Surveying exam
C. It confirms eligibility after passing the Fundamentals of Surveying exam and serves as
a prerequisite for advanced licensure exams
D. It replaces the requirement for any formal education
Answer: C
Rationale: The SIT designation is granted after passing the FS exam and is required
before progressing to higher-level exams.
12. Which national examination must typically be passed first before an applicant
may be eligible for additional surveying licensure exams?
A. State-Specific Surveying Exam
B. Principles and Practice of Surveying (PS) Exam
C. Fundamentals of Surveying (FS) Exam
Practice Questions And Correct
Answers (Verified Answers) Plus
Rationale 2026 Q&A| Instant
Download GRADED A+
1. The primary purpose of surveying is to:
A. Design buildings
B. Measure and determine positions of points on Earth's surface
C. Manufacture instruments
D. Analyze soil composition
Answer: B
Rationale: Surveying involves measuring distances, angles, and positions to establish
locations on the Earth's surface.
2. A surveyor uses a benchmark to establish:
A. Horizontal distance
B. Reference elevation
C. Property ownership
D. Soil type
Answer: B
Rationale: A benchmark is a fixed reference point with a known elevation.
3. The basic unit of length in the U.S. customary surveying system is:
, A. Meter
B. Foot
C. Kilometer
D. Centimeter
Answer: B
Rationale: Surveying in the United States commonly uses feet for linear measurements.
4. Precision refers to:
A. Closeness to the true value
B. Degree of repeatability of measurements
C. Size of an instrument
D. Speed of measurement
Answer: B
Rationale: Precision describes how closely repeated measurements agree with each
other.
5. Accuracy refers to:
A. Agreement with the true value
B. Number of measurements taken
C. Instrument weight
D. Measurement speed
Answer: A
Rationale: Accuracy indicates how close a measurement is to the actual value.
6. A total station measures:
A. Angles and distances electronically
B. Soil density only
, C. Only vertical angles
D. Magnetic direction
Answer: A
Rationale: A total station measures angles and distances electronically.
7. A closed traverse:
A. Ends at its starting point
B. Has no measurements
C. Uses only vertical angles
D. Cannot be adjusted
Answer: A
Rationale: A closed traverse returns to the starting point and allows error checks.
8. A field notebook is used to:
A. Record survey observations
B. Store equipment
C. Calculate taxes
D. Draw architectural plans only
Answer: A
Rationale: Field notes document measurements, observations, and procedures.
9. A survey stake is used to:
A. Mark a location on the ground
B. Measure temperature
C. Determine ownership automatically
D. Calculate angles
, Answer: A
Rationale: Stakes provide physical markers for surveyed points.
10. The main purpose of leveling is to determine:
A. Elevation differences
B. Horizontal angles
C. Magnetic direction
D. Property value
Answer: A
Rationale: Leveling determines elevation differences between points.
11. Which of the following best describes the purpose of the Surveyor-in-Training
(SIT) designation within the licensure pathway?
A. It serves as a final professional license allowing independent practice
B. It certifies completion of the Principles and Practice of Surveying exam
C. It confirms eligibility after passing the Fundamentals of Surveying exam and serves as
a prerequisite for advanced licensure exams
D. It replaces the requirement for any formal education
Answer: C
Rationale: The SIT designation is granted after passing the FS exam and is required
before progressing to higher-level exams.
12. Which national examination must typically be passed first before an applicant
may be eligible for additional surveying licensure exams?
A. State-Specific Surveying Exam
B. Principles and Practice of Surveying (PS) Exam
C. Fundamentals of Surveying (FS) Exam