Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 3 out of 25 pages
Exam (elaborations)

RAIL ROAD COMMISSION (RRC) TEXAS LP-GAS EXAMINATION STUDY GUIDE QUESTIONS AND ANSWERS WITH COMPLETE SOLUTIONS 1100% CORRECT RATED A+

Document preview thumbnail
Preview 3 out of 25 pages

RAIL ROAD COMMISSION (RRC) TEXAS LP-GAS EXAMINATION STUDY GUIDE QUESTIONS AND ANSWERS WITH COMPLETE SOLUTIONS 1100% CORRECT RATED A+

Content preview

RAIL ROAD COMMISSION (RRC)
TEXAS LP-GAS EXAMINATION STUDY
GUIDE QUESTIONS AND ANSWERS
WITH COMPLETE SOLUTIONS 1100%
CORRECT RATED A+
Railroad Commission of Texas
LP-Gas Safety Rules

1. The commission does not adopt language in any NFPA rule, chart, figure or
table pertaining to any LP-Gas container having a water capacity of
_____________ gallon (______pounds LP-gas capacity) or less. -ANSWER ✔✔1.
The commission does not adopt language in any NFPA rule, chart, figure or table
pertaining to any LP-Gas container having a water capacity of
_____________gallon (______pounds LP-gas capacity) or less.


of ____one___gallon (4.2 pounds LP-gas capacity) or less.

2 PSI Regulator System: An ____________ ___________ ______ ____________
that combines a ______ stage regulator, a ___ PSI service regulator and a _______
pressure regulator. -ANSWER ✔✔2 PSI Regulator System: An _LP-GAS_
_vapor_ _delivery_ _system_ that combines a _first_ stage regulator, a _2_ PSI
service regulator and a _line_ pressure regulator.

2 PSI Service Regulator: A ________ regulator for LP-Gas vapor service designed
to reduce first-stage regulator outlet pressure to a nominal ___ psig. -ANSWER
✔✔2 PSI Service Regulator: A ___pressure_____ regulator for LP-Gas vapor
service designed to reduce first-stage regulator outlet pressure to a nominal __2__
psig.

Container: Any vessel, including _______, __________, ______ ______, and
______ _______, used for the transporting, or storing of LP-Gases. -ANSWER
✔✔Container: Any vessel, including __cylinders_____, ___tanks_______,
_portable_____ __tanks____, and ___cargo___ ___tanks____, used for the
transporting, or storing of LP-Gases.

,What are container appurtenances? -ANSWER ✔✔Container Appurtenances:
Devices installed in container openings for safety, control, or operating purposes.
(Examples include pressure-relief devices; shutoff valves, backflow check valves,
excess-flow valves and internal valves; liquid level gauges; pressure gauges; and
plugs).

Who is responsible for Alternative Fuel Safety (AFS)? -ANSWER ✔✔The RRC
(Railroad Commission) Department is responsible for LP-Gas training and
inspection.

LP Gas Safety Rules: The rules adopted by the RRC in the Texas Administrative
Code, Title ___, Part ___, Chapter ___ including any ____ or other documents
adopted by reference. -ANSWER ✔✔LP Gas Safety Rules: The rules adopted by
the RRC in the Texas Administrative Code, Title _16__, Part __1_, Chapter _9__
including any ____ or other documents adopted by reference.

Rules Examination: The commission's _____ examination that measures an
examinee's working knowledge of Chapter ______ of the _____ ______ _______
____ and/or the current _____ _____ rules. -ANSWER ✔✔Rules Examination:
The commission's __written___ examination that measures an examinee's working
knowledge of Chapter ___113___ of the __Texas___ __Natural____
___Resources____ __Code__ and/or the current ___LP__ _Gas____ rules.

What is the ASME? -ANSWER ✔✔ASME stands for the American Society of
Mechanical Engineers

What does DOT stand for? -ANSWER ✔✔The U.S. Department of Transportation

Define Excessive-Flow Valve (or Excess-Flow Check Valve -ANSWER ✔✔A
valve designed to close when the liquid or vapor passing through it exceeds a
prescribed "t" ow rate.
Fixed gauge level.

What is a Fixed Maximum Liquid Level Gauge also known as? (list 4) -ANSWER
✔✔Bleeder Valve
Outage Gauge
Spitter Valve
Spew Gauge

, What is a fixed maximum liquid level gauge? (definition according to study guide)
-ANSWER ✔✔A fixed liquid level gauge that indicates the liquid level at which
the container is filled to its maximum permitted filling limit.

First stage regulator: A _______ regulator for LP-Gas ________ _________
designed to ____________ ___________ from the container to ____ psig or
________. -ANSWER ✔✔First stage regulator: A ___pressure____ regulator for
LP-Gas __vapr______ ___service______ designed to __reduce____
____pressure___ from the container to __10__ psig or ___less_____.

Flexible Connector: A ________ (not exceeding _____ _____ overall length)
______ piping system component that is ______ from ______ material and
_______ with ________ at _________ ends. -ANSWER ✔✔Flexible Connector:
A ____short____ (not exceeding _60____ __inches___ overall length)
__fixed____ piping system component that is ___fabricated___ from
__flexible____ material and _equipped______ with __connections______ at
___both______ ends.

Flexible Hose Connector: a component _________ from LP-Gas ________ that is
made from ______ that is _______ with LP-Gas. -ANSWER ✔✔Flexible Hose
Connector: a component __fabricated_______ from LP-Gas ____hose____ that is
made from __material____ that is __compatible_____ with LP-Gas.

Flexible Metallic Container: A component fabricated from _____ material that
provides _____ and _____ LP-Gas _________ and is provided with ______ on
both ends. -ANSWER ✔✔Flexible Metallic Container: A component fabricated
from ___metallic____ material that provides __liquid___ and __vapor___ LP-Gas
____confinement_____ and is provided with __connections____ on both ends.

Integral Two-Stage Regulator: A _______ regulator for LP-Gas ________ service
that _________ a _______-pressure and a _______-stage regulator unit into a
_______ unit. -ANSWER ✔✔Integral Two-Stage Regulator: A ____pressure___
regulator for LP-Gas ____vapor____ service that __combines_______ a
___high____-pressure regulator and a ____second___-stage regulator unit into a
__single_____ unit.

Leak Check: An operation preformed on a _____ ________ system to _______
that the system does not _____. -ANSWER ✔✔Leak Check: An operation

Document information

Uploaded on
August 8, 2026
Number of pages
25
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$18.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TESTSMASTER
3.8
(23)
Sold
107
Followers
2
Items
12144
Last sold
3 weeks ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions