✔✔Purpose of Mold Assessment - ✔✔The purpose of a mold assessment is to
determine the sources, locations and extent of mold growth in a building, to determine
the conditions that caused the mold growth, and to enable the assessment consultant to
prepare a mold remediation protocol.
✔✔Personal Protective equipment for assessors (PPE) - ✔✔If PPE should be used
during an assessment project the consultant will make sure that all who are engaged in
assessment activities are provided with, fit tested and trained for PPE.
✔✔Containment Requirements for remediation - ✔✔Containment must be specified in a
mold remediation protocol when the mold containment affects a total surface area of 25
contiguous Square feet or more. Containment is not required if space is only occupied
by licensed persons between the start date of the job or stop date of the job.
✔✔A biocide or antimicrobial is being used during the remediation, the chemical must
be - ✔✔registered with the EPA
✔✔Passed Clearance Report - ✔✔Will be issued at the end of each mold remediation
project and will include:
1) a description of relevant worksite observations;
2) the type and location of all measurements made and samples collected at the
worksite;
3) all data obtained at the worksite, including temperature, humidity, and material
moisture readings;
4) the results of analytical evaluation of the samples collected at the worksite;
5) copies of all photographs taken by the mold assessment consultant
6) a clear statement that the project has passed clearance.
, ✔✔Photographs taken pre and post remediation the mold remediation contractor will
provide the the property owner with photographs of the scene of the mold not later
than_______ days. - ✔✔10
✔✔ According to state regulation (Texas)Mold Remediation Rules, an owner or their
employees are NOT required to be licensed to perform mold remediation on a
residential property they own and has fewer than ______ dewelling units. - ✔✔10
✔✔TMRR, Stop Date is defined as - ✔✔The date following a day on which final
clearance is achieved following a mold remediation project.
✔✔TMRR, a person whose license has expired for more than ______ ___________
must obtain a new license and must comply with current requirements, including any
state examination requirements. - ✔✔6 months or 180 days
✔✔TMRR, a Mold Assessment Tech (MAT) is NOT licensed to: - ✔✔Develop a Mold
Management Plan or a Mold Remediation Protocol.
✔✔TMRR, the air pressure within a walk-in containment must be ________________
the pressure in building areas adjacent to the containment. - ✔✔Lower than
✔✔TMRR, signs advising that mold remediation project is in progress shall bear the
words: - ✔✔Notice; Mold remediation project in progress.
✔✔TMRR, the signs should be what size and colors - ✔✔8X10, black letter on a yellow
background.
✔✔TMRR, for a remediation project to achieve clearance, a ____________
__________ _______________ shall conduct a post remediation assessment using
visual, procedural, and analytical methods. - ✔✔Mold Assessment Consultant
✔✔TMRR, Not later than ____ ____________ after completion of a mold remediation
project, the licensed mold remediation contractor or company shall provide the property
owner with copies of required photographs of the scene of the mold remediation taken
before and after remediation - ✔✔1 week
✔✔TMRR, not later than the ________ day after the project stop date, the licensed
mold remediation contractor or company shall provide a certificate of mold remediation
to the property owner on a form adopted by the Texas Commissioner of insurance. -
✔✔10th day
✔✔TMRR, Which of the following is NOT an example of a critical violation ( Level 1) -
✔✔Working with a credential or ID card that has been expired for one month or less.
ANSWERS SET A+
✔✔Purpose of Mold Assessment - ✔✔The purpose of a mold assessment is to
determine the sources, locations and extent of mold growth in a building, to determine
the conditions that caused the mold growth, and to enable the assessment consultant to
prepare a mold remediation protocol.
✔✔Personal Protective equipment for assessors (PPE) - ✔✔If PPE should be used
during an assessment project the consultant will make sure that all who are engaged in
assessment activities are provided with, fit tested and trained for PPE.
✔✔Containment Requirements for remediation - ✔✔Containment must be specified in a
mold remediation protocol when the mold containment affects a total surface area of 25
contiguous Square feet or more. Containment is not required if space is only occupied
by licensed persons between the start date of the job or stop date of the job.
✔✔A biocide or antimicrobial is being used during the remediation, the chemical must
be - ✔✔registered with the EPA
✔✔Passed Clearance Report - ✔✔Will be issued at the end of each mold remediation
project and will include:
1) a description of relevant worksite observations;
2) the type and location of all measurements made and samples collected at the
worksite;
3) all data obtained at the worksite, including temperature, humidity, and material
moisture readings;
4) the results of analytical evaluation of the samples collected at the worksite;
5) copies of all photographs taken by the mold assessment consultant
6) a clear statement that the project has passed clearance.
, ✔✔Photographs taken pre and post remediation the mold remediation contractor will
provide the the property owner with photographs of the scene of the mold not later
than_______ days. - ✔✔10
✔✔ According to state regulation (Texas)Mold Remediation Rules, an owner or their
employees are NOT required to be licensed to perform mold remediation on a
residential property they own and has fewer than ______ dewelling units. - ✔✔10
✔✔TMRR, Stop Date is defined as - ✔✔The date following a day on which final
clearance is achieved following a mold remediation project.
✔✔TMRR, a person whose license has expired for more than ______ ___________
must obtain a new license and must comply with current requirements, including any
state examination requirements. - ✔✔6 months or 180 days
✔✔TMRR, a Mold Assessment Tech (MAT) is NOT licensed to: - ✔✔Develop a Mold
Management Plan or a Mold Remediation Protocol.
✔✔TMRR, the air pressure within a walk-in containment must be ________________
the pressure in building areas adjacent to the containment. - ✔✔Lower than
✔✔TMRR, signs advising that mold remediation project is in progress shall bear the
words: - ✔✔Notice; Mold remediation project in progress.
✔✔TMRR, the signs should be what size and colors - ✔✔8X10, black letter on a yellow
background.
✔✔TMRR, for a remediation project to achieve clearance, a ____________
__________ _______________ shall conduct a post remediation assessment using
visual, procedural, and analytical methods. - ✔✔Mold Assessment Consultant
✔✔TMRR, Not later than ____ ____________ after completion of a mold remediation
project, the licensed mold remediation contractor or company shall provide the property
owner with copies of required photographs of the scene of the mold remediation taken
before and after remediation - ✔✔1 week
✔✔TMRR, not later than the ________ day after the project stop date, the licensed
mold remediation contractor or company shall provide a certificate of mold remediation
to the property owner on a form adopted by the Texas Commissioner of insurance. -
✔✔10th day
✔✔TMRR, Which of the following is NOT an example of a critical violation ( Level 1) -
✔✔Working with a credential or ID card that has been expired for one month or less.