VA CONTRACTORS EXAMS WITH
ACCURATE ANSWERS

A contractor does not notify a change of address and so does not receive a
timely Notice of Renewal. Who is responsible for when the contractor does
not renew his license on time? - ANSWER-The Licensee Contractor



A Designated Employee should be? - ANSWER-At least 18, Full Time, Passed
Required Exams



What is the initial Recovery Fund fee? - ANSWER-$25



If a contractor earns more than $_______ per year, then the contractor is
required to have a Class A. - ANSWER-$750,000



If a contract awards more than $_________ per payment, the contractor is
required to have a Class A. - ANSWER-$120,000



An Erosion control conservation plan needs to be approved within ____ days. -
ANSWER-60 Days



Where do you go to file an appeal of a violation to the USBC provisions? -
ANSWER-to The LBBCA

Local

Board of

Building

Code

Appeals

,A contractor is required to submit a renewal within____ days of the expiration
date? - ANSWER-30



Who can file a complaint against a contractor? (under the recovery fund) -
ANSWER-Residential Property Owner



What is required when changing the from of entity from a sole proprietorship
to a corporation - ANSWER-A new license



What is the maximum fund allowed for a single contractor? (per biennium) -
ANSWER-$40,000



To whom should a stop work order be given? - ANSWER-owner, owner's agent
or the person doing the work



Within how many days should be submitted an appeal for construction? -
ANSWER-30 Days



An appeal of the local building officials decision to refuse to grant a
modification to the USBC MUST be made within how many days? - ANSWER-
30 Days



Documents related to a contract should be kept for ______ years? - ANSWER-5



Where should one set of all approved building documents be kept? -
ANSWER-At the building site



An erosion control conservation specification needs to be approved
within_____ days - ANSWER-45 days

,After notification by the code official, an application for a permit shall be
considered to have been abandoned for _____ months - ANSWER-6



Where is the Recovery Fund used? - ANSWER-to pay claimants subject to
improper or dishonest conduct of a regulant



Disturbed land areas of less than ______ sq ft in size may not be an issue of
sediment and erosion control. - ANSWER-10,000



A designated employee must work a minimum of how many hours for a
licensed contracting business? - ANSWER-30 hours



The Board can refuse to renew a license when the principal owner is a former
owner or officer of a firm that______ - ANSWER-Had its contractor licensee
revoked



what is the maximum amount a single contractor's Transaction Recovery
Fund claim against a licensee can be? - ANSWER-$40,000



A license was issued on 10/15/2021. The expiration date is? - ANSWER-
10/31/2023



What is the maximum amount that can be paid out on behalf of a single
contractor? - ANSWER-$40,000



A code official can begin legal proceedings against a contractor with a
minimum of how many violations within one calendar year for work without a
permit: - ANSWER-Three

, Where must a building permit be posted? - ANSWER-at the building site



A new building may be used after ______________ is issued. - ANSWER-
Certificate of occupancy



Any issued permit shall become invalid if work is not commenced within
_________ Months after issuance. - ANSWER-6



A notification that funds are due is issued, but the funds are not paid. After a
second notice, the funds must be paid in _________ days. If there is still no
payment, then the license is ______________. - ANSWER-30, suspended



An owner wants a swimming pool built in a specified location. The location is
in violation of the local code. The contractor should - ANSWER-Not agree to
build the pool



An individual qualifying for licensure which require a trade exam must -
ANSWER-Be a full time employee



All of the following are required on a written contract EXCEPT - ANSWER-
Permit numbers



if licensees are notified at the time of renewal that an additional fee for the
contractor recovery fund is due, and the licensee does not pay the fee at
that time, how much additional time is licensee given? - ANSWER-30 days



when is a renewal or reinstatement application considered to be received by
the board? - ANSWER-When the application and fees are received by the
board

Document information

Uploaded on
August 6, 2026
Number of pages
35
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$17.54

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
0
Followers
0
Items
87
Last sold
-


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions