Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 3 out of 20 pages
Exam (elaborations)

NERC System Operator Exam Additional Practice Questions | Actual Test Questions and Answers – Balancing Authority, ACE, Transmission Operations | Latest Update 2026/2027 (Graded A+)

Document preview thumbnail
Preview 3 out of 20 pages

Prepare for your NERC certification exam with this verified set of scenario-based practice questions covering balancing authority operations, ACE calculations, frequency response, transmission line loading and SOL/IROL violations, reactive power and voltage control, system restoration, GMD impacts, and emergency operating procedures (EEA levels). Includes detailed calculation problems (MVA, MVAR, current, inadvertent interchange) and real-world operator scenarios matching the style of the actual NERC exam. Ideal for system operators, transmission operators, and reliability coordinators studying for NERC certification or recertification. Graded A+ and verified accurate.

Content preview

Additional NERC Test Questions | Actual Questions and Answers Latest
Updated 2024/2025 (Graded A+)



1. Balancing Authority A is importing MW and has a tie-Iine flowing into them when the meter fails to
zero. Which of the following statements is true?

A) The Balancing Authority's frequency will drop

B) The Balancing Authority's generators on AGC will decrease output

C) The Balancing Authority's frequency will increase

D) The Balancing Authority's ACE reading will decrease - ✔✔B) The Balancing Authority's generators on
AGC will decrease output



2. Balancing Authority A has tie-line meter fail to zero on a line that is exporting 200 MWs. Which of the
following statements is true?

A) The Balancing Authority's total demand indication will increase

B) The Balancing Authority's generators on AGC will decrease output

C) The Balancing Authority's frequency will decrease

D) The Balancing Authority's ACE reading will increase - ✔✔A) The Balancing Authority's total demand
indication will increase



3. How does a System Operator realize the power system is getting close to the end of its available
reactive resources?

A) The voltage is increasing

B) The rate of decrease/increase of the voltage does not relate to change in the load

C) The rate of increase of the voltage decreases with the load

D) The rate of decrease of the voltage increases with the load - ✔✔D) The rate of decrease of the
voltage increases with the load



4. Which of the following indications would result from a significant loss of generation on an external
BA?

A) your ACE goes up and frequency stays the same

,B) your ACE stays the same and frequency increases

C) your ACE stays the same and frequency decreases

D) your ACE goes down and frequency drops - ✔✔D) your ACE goes down and frequency drops



5. You have restored a line to service after an outage. After closing the line, one of the phases shows no
current flow. What is your next action?

A) Have the on-site crew open the line

B) Notify your RC

C) Call the crew that restored the line to check reading on each phase

D) Report RTU problem - ✔✔C) Call the crew that restored the line to check reading on each phase



6. Which of the following would classify as an Operating Instruction?

A) Requesting generator status from a Generator Operator

B) Discussing Operating Plan with an Adjacent Transmission Operator

C) Directing a Generator Operator to maintain current MVAR output of a generator

D) Requesting outage information from a Distribution Provider - ✔✔C) Directing a Generator Operator
to maintain current MVAR output of a generator



7. After the winter morning peak, you have CTs base-loaded unable to decrease output and other units
unable to regulate any lower. Nuclear units are loaded and your solar is starting to pick up. ACE is
trending up and you have no regulation. What would you do? - ✔✔A) Take your CTs off-line

B) Increase Interchange out

C) Curtail solar power production

D) Consider available spinning reserve and replace resources planned for the day

:: A) Take your CTs off-line



8. How can you more effectively increase the MW transfer rate through a transmission line?

A) Decrease Voltage on the sending end

B) Change taps on the Phase Shifting Transformer (PST)

C) Increase load on the receiving end

, D) Install series reactor in the line - ✔✔B) Change taps on the Phase Shifting Transformer (PST)



9. Generators will trip on an under-frequency condition of approximately 57.5 Hz. What is the purpose
of generator under-frequency trips?

A) To protect the turbine from damage

B) To protect the generator windings from overheating

C) To rebalance generation and load and arrest the frequency drop

D) To prevent islanding conditions - ✔✔A) To protect the turbine from damage



10. What is the expected inrush of cold load?

A) less than 5 times the MVA

B) up to 10 times the MVA

C) up to 20 times the MVA

D) no changes in MVA - ✔✔B) up to 10 times the MVA



11. A Balancing Authority Area has two 800 MW generators, three 400 MW generators, and many
generators less than 200 MW. What is the MSSC for this Balancing Area?

A) 1600 MW

B) 800MW

C) 640 MW

D) 1200 MW - ✔✔B) 800MW



12. Line A has an SOL of 250 MVA and is currently loaded at 200 MVA) Line B is loaded at 500 MVA and
has an LODF of 0.2 to Line A. If Line B relays out what will be the new power flow on Line A?

A) 300 MVA

B) 325 MVA

C) 290 MVA

D) 245 MVA - ✔✔A) 300 MVA

Document information

Uploaded on
August 3, 2026
Number of pages
20
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$9.89

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
2
Followers
0
Items
491
Last sold
3 days ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions