In a non-anesthetizing area, on which side of a zoned
valve shall the pressure/vacuum sensor be located? -
Answer-Station outlet/inlet
What is the purpose of using an oxygen analyzer during
the piping purge prior to brazing? - Answer-To assure that
all ambient air has been removed from the pipeline
A medical gas master or area alarm panel should be set to
actuate an ____ indicator when the communication with
an alarm initiating device is disconnected. - Answer-
Audible and visual
When an EOSC becomes the temporary supply source, a
facility will monitor the system by use of? - Answer-
Providing four connection points through two master
alarms
,2|Page
What condition must be met where medical gas and
vacuum systems are installed by non certified personnel?
- Answer-Installation by anyone other than 6010 certified
personnel is not permitted
Which of the following systems shall not permitted to be
located in an outdoor inclosure?
A. Bulk cryogenic liquid system
B. Manifolds for cryogenic liquid cylinders
C. Manifolds for gas cylinders with or without reserve
D. Medical air compressors supply sources - Answer-
medical air compressors supply sources
Metallic flexible joints are being used in the pipeline for
vibration control. What is NOT, required for such a joints?
A) able tho withstand 1000 degrees
B) provide brazing extensions to allow brazing in to the
pipe line.
C) received on the job site with certification of cleanliness
D) Suitable for service at 150, p.s.i. or above - Answer-
Suitable for service at 150, p.s.i. or above
, 3|Page
Who shall witness the installer perform both standing
pressure test and standing vacuum test?
A) installation contractor superintendent.
B) Medical Gas verifier
C) The authority having jurisdiction or its designee
D) a witness is not required - Answer-The authority having
jurisdiction or its designee
When is the initial pressure test conducted, by a medical
gas installer, on a nitrous oxide system? - Answer-After
blow down of a distribution pipeline
In those portions of systems intended to handle oxygen at
pressures greater than 350 PSI, the interconnecting hose
shall not contain _____ materials? - Answer-Polymeric
In category one dental and gas vacuum piping systems,
what is the NFPA 99 requirement for the labeling of pipes?
- Answer-Color coding
What treatments shall be performed before brazing cut
ends of a tube to be installed in a medical gas piping
MED GAS TEST EXAM (LATEST 2026) MOST RECENT
EXAM 2026|2027 ACTUAL COMPLETE REAL VERIFIED
EXAM QUESTIONS AND CORRECT ANSWERS
(VERIFIED ANSWERS) ALREADY GRADED A+ |
GUARANTEED SUCCES!! NEWEST EXAM!!!
In a non-anesthetizing area, on which side of a zoned
valve shall the pressure/vacuum sensor be located? -
Answer-Station outlet/inlet
What is the purpose of using an oxygen analyzer during
the piping purge prior to brazing? - Answer-To assure that
all ambient air has been removed from the pipeline
A medical gas master or area alarm panel should be set to
actuate an ____ indicator when the communication with
an alarm initiating device is disconnected. - Answer-
Audible and visual
When an EOSC becomes the temporary supply source, a
facility will monitor the system by use of? - Answer-
Providing four connection points through two master
alarms
,2|Page
What condition must be met where medical gas and
vacuum systems are installed by non certified personnel?
- Answer-Installation by anyone other than 6010 certified
personnel is not permitted
Which of the following systems shall not permitted to be
located in an outdoor inclosure?
A. Bulk cryogenic liquid system
B. Manifolds for cryogenic liquid cylinders
C. Manifolds for gas cylinders with or without reserve
D. Medical air compressors supply sources - Answer-
medical air compressors supply sources
Metallic flexible joints are being used in the pipeline for
vibration control. What is NOT, required for such a joints?
A) able tho withstand 1000 degrees
B) provide brazing extensions to allow brazing in to the
pipe line.
C) received on the job site with certification of cleanliness
D) Suitable for service at 150, p.s.i. or above - Answer-
Suitable for service at 150, p.s.i. or above
, 3|Page
Who shall witness the installer perform both standing
pressure test and standing vacuum test?
A) installation contractor superintendent.
B) Medical Gas verifier
C) The authority having jurisdiction or its designee
D) a witness is not required - Answer-The authority having
jurisdiction or its designee
When is the initial pressure test conducted, by a medical
gas installer, on a nitrous oxide system? - Answer-After
blow down of a distribution pipeline
In those portions of systems intended to handle oxygen at
pressures greater than 350 PSI, the interconnecting hose
shall not contain _____ materials? - Answer-Polymeric
In category one dental and gas vacuum piping systems,
what is the NFPA 99 requirement for the labeling of pipes?
- Answer-Color coding
What treatments shall be performed before brazing cut
ends of a tube to be installed in a medical gas piping