Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 3 out of 16 pages
Exam (elaborations)

FDOT Earthwork LEVEL 1 Exam Questions and Answers Verified Solutions Latest Update

Document preview thumbnail
Preview 3 out of 16 pages

FDOT Earthwork LEVEL 1 Exam Questions and Answers Verified Solutions Latest Update

Content preview

FDOT Earthwork LEVEL 1 Exam
Questions
and Answers Verified Solutions Latest
Update


Question:

Earthwork has to do with the roadway in what way?.

Answer:
Earthwork is the excavation and placement of soils and materials supporting the
proposed roadway.


Question:

In Earthwork what is a lift?.

Answer:
6" of compacted depth at full width


Question:

In Earthwork what is a Lot?.

Answer:
A lot is 1 lift at 500 ft or within compacted area. Isolated compaction operations are
separate lots.


Question:

Sampling at the roadway is done for.

Answer:
Done for base, sub grade, and embankment.

,Question:

Sampling is determined how.

Answer:
generated with random numbers usually by a Verification Inspector


Question:

What is important about sampling at the roadway.

Answer:
Minimum of three representative sample combined.


Question:

What is LIMS?.

Answer:
Laboratory Info Management System


Question:

The proctor theory is when compaction is achieved how.

Answer:
by inputting energy to expel air and water in the soil voids


Question:

Compaction causes.

Answer:
An increase in unit weight, decrease in compressibility and permeability.


Question:

The proctor is determined where and creates what.

Answer:
In a laboratory and establishes a density standard to be used on the roadway

, Question:

Lab proctors are created how.

Answer:
Material is gathered from the road and prepared with different amounts of water then
placed in molds and hammered


Question:

What is a modified proctor used in.

Answer:
It is used in base, sub grade, MSE wall back fill materials


Question:

Modified proctors are created how.

Answer:
With a 10lb hammer(rammer) on a 18" drop with 56 blows per layers with 5 layers in
total.


Question:

What is a standard proctor used in.

Answer:
It is used in embankment and structure back fill materials


Question:

Standard proctors are created how.

Answer:
With a 5.5lb hammer(rammer) on a 12" drop with 25 blows per layer with 3 layers in
total


Question:

Comparison between VT and QC density test tolerance.

Answer:
2 lbs/pcf

Document information

Uploaded on
July 27, 2026
Number of pages
16
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$11.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
0
Followers
0
Items
336
Last sold
-


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions