Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 8 pages
Exam (elaborations)

CSTM 451 EXAM 1_53 QUESTIONS WITH VERIFIED ANSWERS,100%CORRECT

Document preview thumbnail
Preview 2 out of 8 pages

CSTM 451 EXAM 1_53 QUESTIONS WITH VERIFIED ANSWERS Obtaining the funding for the project - CORRECT ANSWER Which of these is not a typical step on the Road to implementing a Project Delivery Method? none of the above. (design-bid build, Cm at risk, design- build, all of the above) - CORRECT ANSWER Fast-track is a defining characteristic of which of the following delivery methods? -Are the design and construction under separate contracts directly to the owner or are the combined under one contract? -Is the final selection of the constructor based on criteria other than just the lowest construction costs? - CORRECT ANSWER Which of the following are considered "defining" characteristics? -A Guaranteed Maximum Price (GPM) contract -a contractual schedule guarantee -Preconstruction services -The construction can be fast-tracked - CORRECT ANSWER which of the following are considered "typical characteristics"? Best Value: Total Cost - CORRECT ANSWER If an owner selects a contractor using a competition based on the total construction cost based on less than complete design and a final selection based on both the price and other non-price criteria, which procurement method is this?

Content preview

CSTM 451 EXAM 1_53 QUESTIONS WITH VERIFIED
ANSWERS
Obtaining the funding for the project - CORRECT ANSWER Which of these is not a
typical step on the Road to implementing a Project Delivery Method?


none of the above. (design-bid build, Cm at risk, design- build, all of the above) -
CORRECT ANSWER Fast-track is a defining characteristic of which of the following
delivery methods?


-Are the design and construction under separate contracts directly to the owner
or are the combined under one contract?
-Is the final selection of the constructor based on criteria other than just the
lowest construction costs? - CORRECT ANSWER Which of the following are
considered "defining" characteristics?


-A Guaranteed Maximum Price (GPM) contract
-a contractual schedule guarantee
-Preconstruction services
-The construction can be fast-tracked - CORRECT ANSWER which of the following
are considered "typical characteristics"?


Best Value: Total Cost - CORRECT ANSWER If an owner selects a contractor using a
competition based on the total construction cost based on less than complete
design and a final selection based on both the price and other non-price criteria,
which procurement method is this?

, Best Value: Fees - CORRECT ANSWER Based on the definitions used in this chapter,
in which procurement method are the fees and the contractor's general
conditions part of the final selection criteria but not the total construction cost?


-Development manager
-Agent CMs
-Program managers - CORRECT ANSWER Third party options for program
management include which of the following?


The number of contracts - CORRECT ANSWER Based on the definitions used in this
chapter, the difference between Multiple Prime Contracting and Direct
Subcontracting is:


Invitation to Bid - CORRECT ANSWER which of the following is not a procurement
method?


Low Bid - CORRECT ANSWER Which of these selections types does not typically
employ a RFQ/RFP process?


-Low Bid
-Best Value: Fees
-Best Value: Total Cost
-Qualifications Based Selection - CORRECT ANSWER Which of the following can be
used as a prequalification process?

Document information

Uploaded on
July 24, 2026
Number of pages
8
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$14.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
paulhans
3.5
(136)
Sold
796
Followers
641
Items
7840
Last sold
6 days ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions