Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Document preview thumbnail
Voorbeeld 4 van de 95 pagina's
Tentamen (uitwerkingen)

EXAC Exam 1 Actual Exam Study Questions with 100% Verified Answers Already Graded A+

Document preview thumbnail
Voorbeeld 4 van de 95 pagina's

EXAC Exam 1 Actual Exam Study Questions with 100% Verified Answers Already Graded A+ 1. How much liability insurance is an architect required to have? - ANSWER Depends on the province, In Alberta there is no requirement. 2. What resources are available to an architect to produce a project cost estimate? - ANSWER Quantity Surveyors Construction Managers Construction Price Index Publications - from gov, companies, interest groups CHOP 2.3.3 3. What are the Owner/Client characteristics that can influence construction costs? - ANSWER design requiring high standards of quality or rigorous quality control procedures (especially long life cycle, redundancies in spaces); complex bidding procedures; insurance requirements above the norm; extensive bonding requirements; poorly written, sometimes inequitable, non-standard contract wording; long delays in issuing payments to contractors. CHOP 2.3.3 4. What are the 4 methods of construction cost estimation? - ANSWER Elemental Area (Cost per m2/per ft2) Volume (Cost per m3) Unit Use - (Cost per bed, cost per seat, etc.) 5. What does a progressive releasing of hold backs mean? - ANSWER It means that certain subcontractor hold backs may be released in advance of substantial performance, certifying them as complete. 6. List 5 examples of additional services not listed as basic under RAIC Doc 6 - ANSWER 1. financial feasibility studies, 2. business cases 3. preparing functional programs 4. submissions to authorities 5. life cycle cost studies. CHOP 2.1.10 7. What is the purpose of Schedule A (For Alberta) - ANSWER It is a letter of commitment from the COORDINATING registered professional to the AHJ that they will Design of the building and the Field Review will be conducted to ensure compliance with the ABC 8. What is the purpose of Schedule B (For Alberta) - ANSWER It is a letter of commitment from the registered professional to the AHJ that they will Design of the building and the Field Review will be conducted to ensure compliance with the ABC 9. What is the purpose of Schedule C (For Alberta) - ANSWER (Also known as a letter of assurance) A declaration that the registered professional has carried out their duties to ensure the building was designed and constructed in compliance to ABC and outlines an differences between BP and Record Drawings 10. What are two possible legal procedures affecting the construction of buildings? - ANSWER CHOP 1.2.4, p.4 Injunction - sought when a public body applies to the court for an order restraining a private individual or other body from violating an applicable law. It is often applied to stop an individual or company from constructing a building contrary to regulations, codes or bylaws. A typical example is a "stop work order." Mandamus - an order directing a public body to exercise a public duty, such as the issuance of a building permit. If a municipality refuses to issue a building permit and forces the client to apply to the court for a mandamus, the architect must be sure that all building plans and specifications comply fully with municipal bylaws and building codes. 11. What are the different construction cost class estimates? - ANSWER Cost Estimate Class A: Construction Documentation (degree of accuracy 5%) Cost Estimate Class B: Design Development (degree of accuracy 10%) Cost Estimate Class C: Schematic Design (degree of accuracy 15%) Cost Estimate Class D: Rough Order of Magnitude (degree of accuracy 20%) CHOP 2.3.3, p.3 & 19 12. What is a Schedules of Values (CCDC) - ANSWER Prior to the first application for payment, a schedule of values is issued contained a breakdown for various parts of the Work completed to date to facilitate evaluation of future applications for payments. The schedule of values assists the Consultant and Owner in the systematic review progress claims. It identified the amount of work performed to date, typically as a percentage of overall completion.

Voorbeeld van de inhoud

EXAC Exam 1 Actual Exam Study
Questions with 100% Verified
Answers Already Graded A+

1. How much liability insurance is an architect required to have? - ANSWER
Depends on the province, In Alberta there is no requirement.


2. What resources are available to an architect to produce a project cost
estimate? - ANSWER Quantity Surveyors
Construction Managers
Construction Price Index
Publications - from gov, companies, interest groups
CHOP 2.3.3


3. What are the Owner/Client characteristics that can influence construction
costs? - ANSWER design requiring high standards of quality or
rigorous quality control procedures
(especially long life cycle, redundancies in spaces);
complex bidding procedures;
insurance requirements above the norm;
extensive bonding requirements;
poorly written, sometimes inequitable,
non-standard contract wording;
long delays in issuing payments to contractors.
CHOP 2.3.3

,4. What are the 4 methods of construction cost estimation? - ANSWER
Elemental
Area (Cost per m2/per ft2)
Volume (Cost per m3)
Unit Use - (Cost per bed, cost per seat, etc.)


5. What does a progressive releasing of hold backs mean? - ANSWER It
means that certain subcontractor hold backs may be released in advance of
substantial performance, certifying them as complete.


6. List 5 examples of additional services not listed as basic under RAIC Doc 6
- ANSWER 1. financial feasibility studies,
2. business cases
3. preparing functional programs
4. submissions to authorities
5. life cycle cost studies.
CHOP 2.1.10


7. What is the purpose of Schedule A (For Alberta) - ANSWER It is a letter of
commitment from the COORDINATING registered professional to the AHJ
that they will Design of the building and the Field Review will be conducted
to ensure compliance with the ABC


8. What is the purpose of Schedule B (For Alberta) - ANSWER It is a letter of
commitment from the registered professional to the AHJ that they will
Design of the building and the Field Review will be conducted to ensure
compliance with the ABC

,9. What is the purpose of Schedule C (For Alberta) - ANSWER (Also known
as a letter of assurance) A declaration that the registered professional has
carried out their duties to ensure the building was designed and constructed
in compliance to ABC and outlines an differences between BP and Record
Drawings


10.What are two possible legal procedures affecting the construction of
buildings? - ANSWER CHOP 1.2.4, p.4
Injunction - sought when a public body applies to the court for an order
restraining a private individual or other body from violating an applicable law.
It is often applied to stop an individual or company from constructing a building
contrary to regulations, codes or bylaws. A typical example is a "stop work
order."
Mandamus - an order directing a public body to exercise a public duty, such as
the issuance of a building permit. If a municipality refuses to issue a building
permit and forces the client to apply to the court for a mandamus, the architect
must be sure that all building plans and specifications comply fully with
municipal bylaws and building codes.


11.What are the different construction cost class estimates? - ANSWER Cost
Estimate Class A: Construction Documentation (degree of accuracy 5%)
Cost Estimate Class B: Design Development (degree of accuracy 10%)
Cost Estimate Class C: Schematic Design (degree of accuracy 15%)
Cost Estimate Class D: Rough Order of Magnitude (degree of accuracy 20%)
CHOP 2.3.3, p.3 & 19


12.What is a Schedules of Values (CCDC) - ANSWER Prior to the first
application for payment, a schedule of values is issued contained a
breakdown for various parts of the Work completed to date to facilitate
evaluation of future applications for payments. The schedule of values
assists the Consultant and Owner in the systematic review progress claims. It

, identified the amount of work performed to date, typically as a percentage of
overall completion.


If drawings and specifications disagree, which takes precedence? - ANSWER
CCDC 3, GC 1.1.7.1 & CHOP 2.3.8, Specifications and Drawings
In the event of conflict between the two, the specifications take precedence over
the drawings.


What Buildings Require the services of an Architect - ANSWER (a) a building, 3
storeys or less in height, for assembly
occupancy or institutional occupancy that,
(i) in the case of a single storey building, has a gross area of
300 square metres or less,
(ii) in the case of a 2 storey building, has a gross area of 150
square metres or less on each floor, or
(iii) in the case of a 3 storey building, has a gross area of 100
square metres or less on each floor;
(b) a building for residential occupancy that
(i) is a single family dwelling, or
(ii) is a multiple family dwelling containing 4 dwelling units
or less;
(c) a building, 3 storeys or less in height, for residential
occupancy as a hotel, motel or similar use that,
(i) in the case of a single storey building, has a gross area of
400 square metres or less,
(ii) in the case of a 2 storey building, has a gross area of 200
square metres or less on each floor, or

Documentinformatie

Geüpload op
23 juli 2026
Aantal pagina's
95
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden
$11.99

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Seller avatar
DrSammuel
5.0
(1)
Verkocht
7
Volgers
0
Items
917
Laatst verkocht
1 week geleden


Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen