EXAM 2026/2027 Accurate Questions with
Correct Detailed Solutions | 100% Guaranteed
Pass
Ace your New York Site Safety Manager (SSM) exam with this targeted study guide. It
features 144 verified practice questions, answers, and tailored to NYC Building Code
Chapter 33 and OSHA standards. It is your key to mastering site hazard assessments,
safety plan enforcement, and passing on the first try.
This comprehensive study resource is specifically structured to help you conquer the NYC
Department of Buildings (DOB) and FDNY certification requirements. Whether you are
reviewing for an initial license or a renewal, this material gives you the exact edge you need.
What This Exam Prep Includes:
144 High-Yield Practice Questions: Modeled directly after actual exam formats to test
your knowledge of construction and demolition safeguards.
Verified Answers: Understand why an answer is correct so you can apply the logic to
situational and scenario-based questions.
NYC Building Code Focus: Dedicated questions on Chapter 33, site safety plan (SSP)
enforcement, and public protection requirements.
OSHA Compliance: In-depth coverage of hazard communication, fall protection,
electrical safety, and daily inspection protocols.
Emergency & Incident Management: Scenarios evaluating your response protocols to
construction accidents and site hazards.
Why Purchase This Guide?
Guaranteed Confidence: Minimize test anxiety by familiarizing yourself with the exact
terminology and question styles used on the official exam.
Save Time: Eliminate the guesswork. All essential codes, laws, and compliance standards
are compiled into a single, easy-to-study document.
Instant Value: Designed for quick self-assessment and rapid retention.
Quiz_________________?
What is NYC Chapter 33?
1
,What is Section 3301 and 3302? -
Answer
Ch 33 = Safeguards During Construction or Demoltion
3301 = General
3302 = Definitions
Quiz_________________?
What do you do when code does not specifically state inspection is needed on an
equipment? -
Answer
[3301.4.1]
Any equipment (except hand tools) that affects safety of public or property shall
be inspected by a COMPETENT PERSON designated by the contractor using the
equipment
This inspection shall be documented in an inspection checklist signed and dated by
the CP
Quiz_________________?
Who is responsible for maintaining construction/demo signs? -
Answer
[3301.9]
The permit holder for the construction/demo work
If no active permits, then the building owner
2
, Quiz_________________?
Name the (8) items that need to be listed on a Project Information Panel -
Answer
[3301.9.1]
1. Rendering, elevation drawing, or zoning diagram
2. "Work in Progress" Title and specifying zoning use
3. Anticipated project completion date
4. Property owner's corporate name, address, phone #
5. Website address or phone # to contact
6. GC name and phone #
7. "To anonymously report unsafe conditions..call 311" in English and Spanish
8. Primary project permit (laminated)
Quiz_________________?
Where should the Project Information Panel be posted?
How high up? -
Answer
[3301.9.1.2]
On the fence on each perimeter
-if the perimeter is greater than 150ft, post at each corner
- posted 4ft high from the ground to the bottom edge of the panel
3
, Quiz_________________?
Name the specs of the Project Information Panel and the (2) exceptions -
Answer
[3301.9.1.4]
6 ft wide x 4 ft high
Exceptions:
1) for demo project = 2'-4" wide x 4ft high
2) Sites that have street frontage less than 60 ft = 55" wide x 36.5" high
Quiz_________________?
What contents should be on the SWS parapet info panel? (3) -
Answer
[3301.9.2.1]
1) Street address of the site
2) Name of contractor responsible for site...if not, then the owner
3) The statement "For more info, visit NYC.GOV/BUILDINGS"
Quiz_________________?
Name the (4) requirements of posting SWS parapet info panel -
Answer
[3301.9.2.2]
1) Posted along the long axis of the SWS
4