OVERVIEW QUESTIONS WITH VERIFIED ANSWERS
Correct
Incorrect
1 of 407
Definition
The process of transferring supplies directly to the customer without
storage.
Give this one a go later!
Receipt Procedures Disposal of hazardous chemicals
Direct Turnover Office Equipment
Don't know?
2 of 407
Term
,Stewardship Land
Give this one a go later!
Material unsuitable for issue, A secure enclosure for controlled
separated from other storage areas substances that weighs 750 pounds
to avoid confusion. or more.
Land not acquired for, or in Examples include BUMED and
connection with General (PP&E). Headquarters Marine Corps.
Don't know?
3 of 407
Term
Demand Frequency
Give this one a go later!
Check the date and mark any materiel
The measurement or quantity in which
that has less than six months life
an item is issued or counted.
remaining.
The number of demands over a
Provided by the supplier to verify
specified period, e.g., 4 per
what is included in the shipment.
quarter.
, Don't know?
4 of 407
Term
Administration area
Give this one a go later!
Proper temperatures should be The space within the warehouse
monitored to avoid deterioration of used for clerical or
products. management functions.
A unique identifier assigned to each Materials that can emit toxic vapors
piece of equipment after processing. when mixed with other chemicals.
Don't know?
5 of 407
Term
Internal controls and reporting mechanisms
Give this one a go later!
, Conducted annually; a physical count of all material within a specific storeroom,
triggered by a random sampling failing to meet a 90 percent inventory accuracy
rate.
Internal controls and reporting mechanisms must be established to ensure the
Head, Biomedical Engineering, the Equipment Manager, and Command Safety
Manager are notified of any incident.
The agency that maintains centralized inventory management and physical
distribution of medical/dental materiel to Naval MTFs/DTFs worldwide.
A physical count of all items designated for separate identification and inventory
control due to their characteristics or costs.
Don't know?
6 of 407
Term
Location Surveys
Give this one a go later!
Shortened by the Prime Vendor utilizing electronic ordering methods, enabling
delivery of ordered materiel within 24 hours.
Equipment determined to be unsatisfactory due to malfunction, design deficiency,
defect, faulty materiel, workmanship, or performance, which may still be used
unless it presents a direct hazard.