Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

NEW YORK SITE SAFETY MANAGER (SSM) EXAM STUDY GUIDE 2026/2027 ACCURATE QUESTIONS WITH CORRECT DETAILED SOLUTIONS || 100% GUARANTEED PASS NEWEST VERSION

Rating
-
Sold
-
Pages
66
Grade
A+
Uploaded on
20-07-2026
Written in
2025/2026

NEW YORK SITE SAFETY MANAGER (SSM) EXAM STUDY GUIDE 2026/2027 ACCURATE QUESTIONS WITH CORRECT DETAILED SOLUTIONS || 100% GUARANTEED PASS NEWEST VERSION What are the load capacity requirements for vertical safety netting cables? - ANSWER️[3308.5.3] Shall withstand a load of at least 200 lbs applied in any direction except upward At what heights shall vertical safety netting cables be installed? - ANSWER️[3308.5.3] 60", 42", 21", 0" When can permanent removal of vertical safety netting occur? - ANSWER️[3308.5.7] On floors where facade is installed, and all openings (including windows) have been permanently enclosed to height of 60" above the floor When is horizontal safety netting required during construction? - ANSWER️[3308.6.1.1] When topmost walkable floor reaches height of 6 stories or 75 ft, netting shall be provided at level not more than 2 stories or 30 feet below: 1) the stripping floor (in concrete structures) 2) the topmost story where concrete has been placed (in steel structures) When is horizontal safety netting required during demo? - ANSWER️[3308.6.1.2] When demo of exterior walls or roof occurs at height greater than 6 stories or 75 feet, netting shall be provided not more than 2 stories or 30 ft below the story where the walls are being removed What is the size of the horizontal safety netting? - ANSWER️[3308.6.2.5] No larger than 1/2" in the vertical or horizontal direction and 3/4" in any other direction How often shall horizontal netting be cleaned? - ANSWER️[3308.6.2.11] Daily What are the heights of the toprail, midrails, toeboard for guardrail system? - ANSWER️[3308.7.2] Toprail = 39-45 inches Midrail = halfway between toprail and floor Toeboard = no more than 1/4" away from floor and shall be at least 3.5" high Guardrail posts shall be spaced how many feet apart? - ANSWER️[3308.7.3.4] 8 feet max What is BC 3309? - ANSWER️Protection of Adjoining Property How many days notice do you give adjoining property owner to gain access? - ANSWER️[3309.1.1] At least 60 day notice For excavation work, when/where is monitoring required? - ANSWER️[3309.4.4] 1) For buildings that are within a distance equal to or less than max depth of excavation 2) For historic structures that are adjacent to or within distance of 90ft from edge of lot where excavation is happening What is roof protection made out of? - ANSWER️[3309.10] 2" flame-retardant foam under 2" flame retardant wood planks under flame retardant plywood What is Section BC 3310? - ANSWER️Requirements for the construction or demolition of a major building What is considered a major building? - ANSWER️10+ stories or 125ft+ 100,000SF+ regardless of height When can a site safety coordinator be designated in lieu of SSM? - ANSWER️[3310.5] 1) Building is less than 15 stories or 200ft in height AND 2) Building footprint is 100,000SF or less When does DOB need to be notified of an alternate SSM/SSC acting in place of the primary SSM/SSC? - ANSWER️[3310.5.1] Any duration longer than 2 consecutive weeks What is the sequence of a SSM/SSC providing notice for a violation? - ANSWER️[3310.8.2] 1) Notify the person responsible for creating the violation 2) if no cooperation, then inform direct supervisor 3) if no cooperation, then inform construction superintendent What is Section BC 3311? - ANSWER️Explosive Powered and Projectile Tools What is Section BC 3312? - ANSWER️Explosives and Blasting What is Section BC 3313? - ANSWER️Flammable and Combustible Mixtures, Compressed Gases, and other Hazardous Materials What is Section BC 3314? - ANSWER️Scaffolds

Show more Read less
Institution
New York Site Safety Manager
Course
New York Site Safety Manager

Content preview

NEW YORK SITE SAFETY MANAGER (SSM)
EXAM STUDY GUIDE 2026/2027
ACCURATE QUESTIONS WITH CORRECT
DETAILED SOLUTIONS || 100%
GUARANTEED PASS NEWEST VERSION


What are the load capacity requirements for vertical safety netting cables? -
ANSWER [3308.5.3]
Shall withstand a load of at least 200 lbs applied in any direction except upward


At what heights shall vertical safety netting cables be installed? -
ANSWER [3308.5.3]
60", 42", 21", 0"


When can permanent removal of vertical safety netting occur? -
ANSWER [3308.5.7]
On floors where facade is installed, and all openings (including windows) have
been permanently enclosed to height of 60" above the floor


When is horizontal safety netting required during construction? -
ANSWER [3308.6.1.1]

,When topmost walkable floor reaches height of 6 stories or 75 ft, netting shall be
provided at level not more than 2 stories or 30 feet below:
1) the stripping floor (in concrete structures)
2) the topmost story where concrete has been placed (in steel structures)


When is horizontal safety netting required during demo? -
ANSWER [3308.6.1.2]
When demo of exterior walls or roof occurs at height greater than 6 stories or 75
feet, netting shall be provided not more than 2 stories or 30 ft below the story
where the walls are being removed


What is the size of the horizontal safety netting? - ANSWER [3308.6.2.5]
No larger than 1/2" in the vertical or horizontal direction
and 3/4" in any other direction


How often shall horizontal netting be cleaned? - ANSWER [3308.6.2.11]
Daily


What are the heights of the toprail, midrails, toeboard for guardrail system? -
ANSWER [3308.7.2]
Toprail = 39-45 inches
Midrail = halfway between toprail and floor
Toeboard = no more than 1/4" away from floor and shall be at least 3.5" high


Guardrail posts shall be spaced how many feet apart? - ANSWER [3308.7.3.4]

,8 feet max


What is BC 3309? - ANSWER Protection of Adjoining Property


How many days notice do you give adjoining property owner to gain access? -
ANSWER [3309.1.1]
At least 60 day notice


For excavation work, when/where is monitoring required? -
ANSWER [3309.4.4]
1) For buildings that are within a distance equal to or less than max depth of
excavation
2) For historic structures that are adjacent to or within distance of 90ft from edge
of lot where excavation is happening


What is roof protection made out of? - ANSWER [3309.10]
2" flame-retardant foam under 2" flame retardant wood planks under flame
retardant plywood


What is Section BC 3310? - ANSWER Requirements for the construction or
demolition of a major building


What is considered a major building? - ANSWER 10+ stories or 125ft+
100,000SF+ regardless of height

, When can a site safety coordinator be designated in lieu of SSM? -
ANSWER [3310.5]
1) Building is less than 15 stories or 200ft in height
AND
2) Building footprint is 100,000SF or less


When does DOB need to be notified of an alternate SSM/SSC acting in place of
the primary SSM/SSC? - ANSWER [3310.5.1]
Any duration longer than 2 consecutive weeks


What is the sequence of a SSM/SSC providing notice for a violation? -
ANSWER [3310.8.2]
1) Notify the person responsible for creating the violation
2) if no cooperation, then inform direct supervisor
3) if no cooperation, then inform construction superintendent


Name the 17 conditions where DOB is to be immediately notified by SSM/SSC of
violation? - ANSWER [3310.8.2.1]
1) A person is operating a crane/derrick/hoisting equipment without a permit and
refuses to stop operations
2) Crane is being operated by unlicensed person and that person refuses to stop
3) No flagperson is present during crane operation
4) SWS required by SSP is not in place during construction or demolition
5) Permits have not been issued for SWS
6) The designer/supplier of SWS has not certified the shed installation

Written for

Institution
New York Site Safety Manager
Course
New York Site Safety Manager

Document information

Uploaded on
July 20, 2026
Number of pages
66
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$13.99
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller
Seller avatar
profFel

Get to know the seller

Seller avatar
profFel Teachme2-tutor
View profile
Follow You need to be logged in order to follow users or courses
Sold
3
Member since
5 months
Number of followers
0
Documents
270
Last sold
1 week ago
A+ Grade Study Guides & Notes,Your One-Stop Study Resource Shop

WELCOME TO PROFFEL Your Exam Success Partner! ✔ ATI | HESI | NCLEX | CJE | WGU ✔ Pharmacology | Pathophysiology ✔ Business | Finance | Certifications ✔ NUR | NURS | BIOD | Portage Learning ⭐ WHY PROFFEL? ✔ 100% Verified | Graded A+ ✔ Detailed Rationales Included ✔ NGN-Style Questions ✔ Latest 2025/2026 & 2026/2027 ✔ Instant PDF Download ✔ Package Deals & Mega Bundles ✔ Guaranteed Pass ✅ ⭐⭐⭐⭐⭐ "Top seller " ⭐⭐⭐⭐⭐ "Passed NCLEX first attempt!" ⭐⭐⭐⭐⭐ "Best exam prep materials!" Browse. Download. Pass! ✅ REFER 3 PEOPLE AND GET 1 DOCUMENT FREE... OR BUY 3 GET 1 DOCUMENT FREE

Read more Read less
0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions